Section 2. Operating Procedures
11
All operating functions are initiated at the control panel. The following section outlines
general procedures and describes specific functions used to coat outdoor media. This
section is divided into the following sub-headings:
1. Loading Materials
2. Pre-heat the laminator
3. Web the laminator
4. Run the laminator
5. Cleaning the laminator
Tools/Supplies Required:
•
IR Gun (optionally purchased)
•
Absorbent towels: soft, lint free, disposable
•
Lab coat or smock
•
Rubber gloves
•
Bucket of water
•
Long neck funnel
1. Loading Materials
Loading the Sealant:
1. Ensure that the Drain Tank valve is open to the Sealant Tank.
2. Ensure that the machine is in STOP mode or turned OFF.
3. Using a long neck funnel, pour
AquaSEAL™
110 or
AquaSEAL™
510 into the
main drain hole in the Drain Pan. The sealant tank holds 37 Liters (10 US
gallons) of sealant. (Be careful not to add too much sealant to the tank.)
Summary of Contents for AquaSEAL SW-5000
Page 22: ...Section 4 After Sales Support 21...