9711 C & Ku-Band TXRX
Installation
3-19
18.
Apply Loctite 242 to, install
and tighten the eight screws
(see red arrows) through the
front of the scalar plate and
into the end of the drop-in
feed assembly.
19.
Route the BLUE leg of the
harness from the lower
interconnect PCB to the right
strut, up to the top strut and
over the dish (with the red
harness leg & coax).
The BLUE leg of the harness attaches
to the lower interconnect PCB.
The RED leg of the harness attaches to
the upper interconnect PCB.
20.
On the back side of the
reflector:
•
If your antenna is a standard
9711 system, connect the
harness to the “Feed” DB25
port on the PCU.
•
If your antenna is a 9711QOR
system, connect the harness
to the “Reflector A” DB25 port
on the QOR Switch Box.
Summary of Contents for 9711 C
Page 4: ......
Page 10: ...Table of Contents x This Page Intentionally Left Blank ...
Page 21: ...Site Survey 9711 C Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Page 57: ...Configuring a Computer for the MXP 9711 C Ku Band TXRX 4 6 This Page Intentionally Left Blank ...
Page 61: ...Setup Tracking Receiver VSAT 9711 C Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Page 81: ...Setup Targeting 9711 C Ku Band TXRX 11 4 This Page Intentionally Left Blank ...
Page 91: ...Quick Start Operation 9711 C Ku Band TXRX 13 6 This Page Intentionally Left Blank ...
Page 115: ...Drawings 9711 C Ku Band TXRX 19 2 This Page Intentionally Left Blank ...
Page 121: ......
Page 122: ......
Page 123: ......
Page 144: ......
Page 151: ......
Page 152: ......
Page 157: ......
Page 159: ......
Page 160: ......