9711 C & Ku-Band TXRX
Site Survey
2-7
2.8.4.
ACU Power Cable/Outlet
The AC power for the ACU and the ADE is not required to be from a UPS (same one that supplies power to
the ADE), but it is recommended.
Power cable shall comply with the provisions of IEC 60092-350 and -351 in so far as practicable.
2.8.5.
Gyro Compass Cable
Use good quality shielded cables (twisted pairs, individually foil wrapped, outer foil with braid overall is best).
You only need 2-wire for NMEA signal, 4-wire for Step-By-Step and 5-wire for Synchro … always use shielded
cable. Be cautious of length and gauge of the run for voltage loss issues.
2.9.
Grounding
Refer to the Installation chapter for grounding/bonding information.
Summary of Contents for 9711 C
Page 4: ......
Page 10: ...Table of Contents x This Page Intentionally Left Blank ...
Page 21: ...Site Survey 9711 C Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Page 57: ...Configuring a Computer for the MXP 9711 C Ku Band TXRX 4 6 This Page Intentionally Left Blank ...
Page 61: ...Setup Tracking Receiver VSAT 9711 C Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Page 81: ...Setup Targeting 9711 C Ku Band TXRX 11 4 This Page Intentionally Left Blank ...
Page 91: ...Quick Start Operation 9711 C Ku Band TXRX 13 6 This Page Intentionally Left Blank ...
Page 115: ...Drawings 9711 C Ku Band TXRX 19 2 This Page Intentionally Left Blank ...
Page 121: ......
Page 122: ......
Page 123: ......
Page 144: ......
Page 151: ......
Page 152: ......
Page 157: ......
Page 159: ......
Page 160: ......