Installation
9711 C & Ku-Band TXRX
3-4
10.
Cut the tie-wraps that hold the Feed Struts
(Top, Left, and Right) to the wooden
diagonal.
11.
Keep the struts in this area as the feed will be
installed on the reflector while it is still
mounted to the reflector support structure.
12.
Cut the tie-wraps that hold the Feed
Assembly and LNB Box (Contains: Feed
Assembly, LNB, Feed Flex Waveguide and
Coaxial Cables) on the pallet.
13.
Keep the Feed assembly in this area.
14.
If provided in this crate, cut the tie-wraps
that hold the Wave Guide Box (contains the
Flex Waveguide and Coaxial Cable) on the
crate.
15.
Keep the Waveguide box in this area.
16.
Install the feed struts (one at a time) to the
reflector, aligning the labels on the end of
the feed strut to the label on the dish.
Summary of Contents for 9711 C
Page 4: ......
Page 10: ...Table of Contents x This Page Intentionally Left Blank ...
Page 21: ...Site Survey 9711 C Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Page 57: ...Configuring a Computer for the MXP 9711 C Ku Band TXRX 4 6 This Page Intentionally Left Blank ...
Page 61: ...Setup Tracking Receiver VSAT 9711 C Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Page 81: ...Setup Targeting 9711 C Ku Band TXRX 11 4 This Page Intentionally Left Blank ...
Page 91: ...Quick Start Operation 9711 C Ku Band TXRX 13 6 This Page Intentionally Left Blank ...
Page 115: ...Drawings 9711 C Ku Band TXRX 19 2 This Page Intentionally Left Blank ...
Page 121: ......
Page 122: ......
Page 123: ......
Page 144: ......
Page 151: ......
Page 152: ......
Page 157: ......
Page 159: ......
Page 160: ......