Principle of coupling in normal operation
Coupling in normal operation enables all the generating sets to be coupled (in voltage and frequency) to a busbar supplied
by a generating set designed as master at the output.
A number (1 to 15) is assigned to each Kerys. This number serves solely to establish the IP address of each Kerys for
communication by Ethernet and loading the programs.
A second number (from 1 to 15) is also assigned to each Kerys and defines the priority.
Example: let us assume a plant of 8 generating sets
Gen
set 1 2 3 4 5 6 7 8
Priority 08 07 06 05 04 03 02 01
The numbers on the first line enable the IP address of each Kerys to be allocated. The numbers on the second line define
the priority.
Therefore Kerys no. 8 with priority 01 is considered to be the master generating set and closes its flow first. The other
generating sets then synchronise one by one to the central busbar, transmitting the information on voltage, frequency and
phase difference to this busbar (see sketch).
CB1
GS1
U1
CB2
GS2
U2
CB3
GS3
U3
Busbar U
Example for 3 GSs:
•
DJ1 (Circuit breaker 1) is closed, the voltage is present on the busbar.
•
Kerys 2 analyses the differences between U2 and U of the busbar before coupling.
•
Kerys 3 analyses the differences between U3 and U of the busbar before coupling.
Each Kerys, independently of its neighbour, will close its discharge on the central busbar.
Wattmetric control
The wattmetric control is used when two generating sets are coupled. It provides optimum management of the number of
generating sets operating by constantly analysing the power required by the user.
Let us take the example of a power plant of 4 x 600 kW generating sets.
The threshold setting screen (1-7-3-3) supplies the following data:
Threshold 1 GS => 2 GS
75%
450 kW
Threshold 2 GS => 1 GS
30 %
360 kW
Threshold 2 GS => 3 GS
75%
900 kW
Threshold 3 GS => 2 GS
30 %
540 kW
Threshold 3 GS => 4 GS
75%
1350 kW
Threshold 4 GS => 3 GS
30 %
720 kW
The maximum available power is 600 x 4 = 2400 kW. Assuming that a single generating set is operating, we will have the following
sequence in the case of linear progression of the load.
When the power required by the application reaches 75% of the power of the generating set in operation (GS at priority 01), i.e.
450 kW, the second GS (at priority 02) is started and is synchronised with GS 1. Its flow is then closed.
72/285
Summary of Contents for R 340 U
Page 1: ...User and maintenance manual for generating sets R340U 33504081101NE_0_1 ...
Page 15: ...Alternator Cabinet Figure 1 3 Examples of identification plates 13 285 ...
Page 18: ...Sockets voltage 208 120V 16 285 ...
Page 125: ...9 Appendix 9 1 Appendix A Engine user and maintenance manual 123 285 ...
Page 126: ...124 285 ...
Page 128: ...126 285 ...
Page 129: ...127 285 ...
Page 130: ...128 285 ...
Page 131: ...129 285 ...
Page 132: ...130 285 ...
Page 133: ...131 285 ...
Page 134: ...132 285 ...
Page 135: ...133 285 ...
Page 136: ...134 285 ...
Page 137: ...135 285 ...
Page 138: ...136 285 ...
Page 139: ...137 285 ...
Page 140: ...138 285 ...
Page 141: ...139 285 ...
Page 142: ...140 285 ...
Page 143: ...141 285 ...
Page 144: ...142 285 ...
Page 145: ...143 285 ...
Page 146: ...144 285 ...
Page 147: ...145 285 ...
Page 148: ...146 285 ...
Page 149: ...147 285 ...
Page 150: ...148 285 ...
Page 151: ...149 285 ...
Page 152: ...150 285 ...
Page 153: ...151 285 ...
Page 154: ...152 285 ...
Page 155: ...153 285 ...
Page 156: ...154 285 ...
Page 157: ...155 285 ...
Page 158: ...156 285 ...
Page 159: ...157 285 ...
Page 160: ...158 285 ...
Page 161: ...159 285 ...
Page 162: ...160 285 ...
Page 163: ...161 285 ...
Page 164: ...162 285 ...
Page 165: ...163 285 ...
Page 166: ...164 285 ...
Page 167: ...165 285 ...
Page 168: ...166 285 ...
Page 169: ...167 285 ...
Page 170: ...168 285 ...
Page 171: ...169 285 ...
Page 172: ...170 285 ...
Page 173: ...171 285 ...
Page 174: ...172 285 ...
Page 175: ...173 285 ...
Page 176: ...174 285 ...
Page 177: ...175 285 ...
Page 178: ...176 285 ...
Page 179: ...177 285 ...
Page 180: ...178 285 ...
Page 181: ...179 285 ...
Page 182: ...180 285 ...
Page 183: ...181 285 ...
Page 184: ...182 285 ...
Page 185: ...183 285 ...
Page 186: ...184 285 ...
Page 187: ...185 285 ...
Page 188: ...186 285 ...
Page 189: ...187 285 ...
Page 190: ...188 285 ...
Page 191: ...189 285 ...
Page 192: ...190 285 ...
Page 193: ...191 285 ...
Page 194: ...192 285 ...
Page 195: ...193 285 ...
Page 196: ...194 285 ...
Page 197: ...195 285 ...
Page 198: ...196 285 ...
Page 199: ...197 285 ...
Page 200: ...198 285 ...
Page 201: ...199 285 ...
Page 202: ...200 285 ...
Page 203: ...201 285 ...
Page 204: ...202 285 ...
Page 205: ...203 285 ...
Page 206: ...204 285 ...
Page 207: ...205 285 ...
Page 208: ...206 285 ...
Page 209: ...207 285 ...
Page 210: ...208 285 ...
Page 211: ...9 2 Appendix B Alternator user and maintenance manual 209 285 ...
Page 212: ...210 285 ...
Page 214: ...212 285 ...
Page 238: ...LEROY SOMER16015ANGOULÊMECEDEX FRANCE 338 567 258 RCS ANGOULÊME www leroy somer com 236 285 ...
Page 249: ...Installation and maintenance R250 A V R 4067 en 2009 05 b LEROY SOMER 11 247 285 ...
Page 269: ...2012 03 e LEROY SOMER 19 Installation and maintenance R 450 AVRs 4531 en 267 285 ...
Page 270: ...www leroy somer com 268 285 ...