![Sculpt AXIS EPI950 Installation & User Manual Download Page 39](http://html.mh-extra.com/html/sculpt/axis-epi950/axis-epi950_installation-and-user-manual_1220098039.webp)
39
6.
INBUILT INTO ISLAND WALL
STEP 7: FIRST LENGTH OF FLUE
Place the first single skin length of flue (with no crimp ends)
around the outside of the spigot. You may also use a heat
resistance sealant (i.e.Firecork) to seal any air gaps. Before
installing the remaining lengths of flue. Prior to continuing with
flue installation please continue to the next step.
STEP 8: COMBUSTIBLE MATERIAL (if required)
Where there is a combustible surface (ie: wall, shelves, televi-
sion, etc) you must use masonry to construct a wall from the
base to the top of the ceiling.
STEP 9: DUCTING
The duct MUST be 4 Zero type (aluminium inner core,
aluminium outer, poly insulated, minimum RI.0) and tested to
AS 4254.1-2012. Outlet MUST be metal.
This unit has been supplied with a ducting kit (consisting
of two ducts and two metal registers), while it is highly
recommended that it be installed, if not installed it will have no
implication on the functioning of the unit.
Cut a hole in the lid of the enclosure nearest to the room where
the heat is to be transferred. Run the ducting from this hole into
the roof space and locate to the room, cut out the plaster and
install a metal register into the ceiling of the desire room.
**PLEASE NOTE: A maximum duct run of 6m is recommended,
A maximum of four ducts can be run off the Axis H1200,
H1200DS, H1400 and EPI950 models, and a maximum of
six ducts for the Axis H1600, H1600DS, H1600XXL and
H1600XXLDS models.