![Sculpt AXIS EPI950 Installation & User Manual Download Page 33](http://html.mh-extra.com/html/sculpt/axis-epi950/axis-epi950_installation-and-user-manual_1220098033.webp)
33
5.2
HEBEL INSTALLATION
STEP 7: TRIM
(OPTIONAL STEP)
**IMPORTANT**
Trim must be fitted onto the firebox PRIOR to installing the
front of the enclosure.
1. Manoeuvre the trim on the front of the firebox
2. On the side of the façade of the firebox drill two holes at
4.2mm.
3. The holes must match with the slotted holes on the trim
4. Manoeuvre the trim into desired position.
5. Fix the trim into place using the screws provided (screws
M5 + washers).
STEP 8: FIRST LENGTH OF FLUE
Place the first single skin length of flue (with no crimp ends)
around the outside of the spigot. You may also use a heat
resistance sealant (i.e.Firecork) to seal any air gaps. Prior to
continuing with flue installation please continue to the next
step.
CAVITY LID
TO BE FULLY
SEALED TO
ALL EDGES.
15°
STEP 9: CAVITY LID & VENTS
**IMPORTANT**
SIDE VENTS
It is highly recommended the cavity lid be installed flat to
ensure sufficient air flow around the appliance.
FRONT VENTS
It is highly recommended the cavity lid be installed on an angle
of 15° facing the front of the fireplace, to ensure sufficient air
flow around the appliance.
The cavity lid must be installed 300mm below the ceiling and
be comprised of the following; minimum 3mm thick steel plate
for support, followed by a 12mm thick heat resistant sheet,
with 1 x 25mm Rockwool sheet. A hole is to be cut in the
centre of the lid in order for the single skin flue to penetrate
through tightly. You may also use a heat resistance sealant
(i.e. Firecork) and heat proof tape to seal any air gaps. It is
important to ensure the cavity lid is fully sealed to all edges.
300mm
BELOW
CEILING