
Assembly between the Fabric Frame and Frame masking system
Made by Adeo Screen sp. Z o.o. (Polska) Specifications are subject to change without notice. E&OE
Please verify that you are working with the latest revision of this document before specifying your screen.
Doc: EL1C – Installation Manual rev4 | 27.04.2015| Download at: www.screenresearch.com 2015 AdeoSreen All Rights Reserved.
Page 24
+
Assembly the frames with the brackets
Put the cable on the groove, the wire exit is on the bottom middle for ELC and Bottom Left for ETC
To install the E-Mask on the wall