7.3 Always Ready
Always-Ready-EN.fm - 01.01.01
397
Republic
of
South
Africa
TFM
Industries
411
Industry
Road
Clayville
Ext
4
P.O.
Box
1200
Olifantsfontein
0027
‐
11
‐
316
4161
0027
‐
11
‐
316
4786
Syria
Said
Kourabi
&
Co.
P.O.
Box
2966
63,
Jadet
Hafez
Ibrahim
Al
Shalan
Str.
Damascus
00963
‐
11
‐
333
65
62
00963
‐
11
‐
333
79
93
Taiwan
Shenger
Corporation
G
21
Fl.
No.
98,
Hsin
‐
Tai
‐
Wu
Rd.
Section
1,
Hsi
‐
Chih
Taipei
Hsien
00886
‐
2
‐
770
88168
00886
‐
2
‐
770
88198
Kingdom
of
Thailand
C
&
C
Corporation
Ltd.
495
Krungthep
Kreetha
Road
Huamark.
Bangapi
Bangkok
10240
0066
‐
2
‐
7317364
‐
73
0066
‐
2
‐
7316824
Czech
Republic
Schwing/Stetter
Ostrava
s.r.o.
Moravska
1215/6
CZ
‐
70030
Ostrava
‐
Hrabuvka
00420
‐
596
‐
746
780
‐
2
00420
‐
596
‐
746
783
Republic
of
Turkey
Alfatek
Co.
Ltd
Ferhatpasa
Mah.,
Akdeniz
CAD.
G
‐
63
SK.,
No
4
34888
Samandira
‐
Istanbul
0090
‐
216
‐
660
09
00
0090
‐
216
‐
660
09
09
c.simsek@alfatekturk.
com
Ukraine
Construction
Machinery
Ltd.
54
a,
Petropavlovskaya
Str.
04086
Kiev
00380
‐
44
‐
467
2601
o.
467
2602
00380
‐
44
‐
467
2607
United
States
of
America
Schwing
America,
Inc.
5900
Centerville
Road
White
Bear
Minnesota
55127
001
‐
651
‐
4
29
09
99
001
‐
651
‐
4
29
34
64
Summary of Contents for SP 1800
Page 1: ...SP 1800 SP 2800 CAT Original operating instructions Stationary concrete pump...
Page 14: ...2 Introduction 12 Trennblatt Einleitung EN fm 01 00 01...
Page 22: ...2 2 Structure of the operating instructions 20 Aufbau BA EN fm 01 05 01...
Page 30: ...2 5 Labelling SCHWING machines 28 Maschinenkennzeichnung SP EN fm 01 04 00...
Page 38: ...2 6 Technical data for SP 1800 2800 CAT 36 Techn Daten SP 1800 2800 CAT EN fm 01 00 00...
Page 68: ...3 Operation 66 Trennblatt_Kapitel Betrieb EN fm 01 00 00...
Page 78: ...3 3 Electrical connection optional 76 Elektrischer Anschluss EN fm 01 10 00...
Page 82: ...3 4 EMERGENCY STOP system for SP 1800 2800 80 Not Halt System SP 1800 2800 EN fm 01 02 00...
Page 98: ...3 6 Drive circuit SP 1800 2800 96 Antriebsschaltung SP 1800 2800 EN fm 01 06 00...
Page 128: ...3 8 Operating the pumping line 126 Foerderleitung_Betrieb EN fm 01 15 03...
Page 164: ...3 16 Control of operations SP 1800 2800 162 Betriebsueberwachung SP 1800 2800 EN fm 01 00 00...
Page 181: ...3 18 Cleaning Reinigung EN fm 01 18 04 179 Fig 124 Trap basket Fig 125 Cleaning head...
Page 190: ...3 18 Cleaning 188 Reinigung EN fm 01 18 04...
Page 214: ...3 21 Difficult operating conditions 212 Erschwerter Betrieb EN fm 01 08 01...
Page 218: ...3 23 Technical preconditions for concreting 216 Betontechnologische Vorauss EN fm 01 04 01...
Page 220: ...4 Maintenance 218 Trennblatt_Kapitel Wartung EN fm 01 00 01...
Page 228: ...4 2 Consumable volumes in litres 226 Betriebsstoffmengen SP EN fm 01 00 00...
Page 240: ...4 3 Recommended lubricants and fuels 238 Schmier Betriebstoffempfehlung EN fm 01 22 01...
Page 244: ...4 4 Spare parts and accessories 242 Ersatzteile Zubehoer EN fm 01 05 02...
Page 266: ...4 9 Pressure checks stationary concrete pumps 264 Druckkontrolle SP EN fm 01 01 01...
Page 286: ...4 12 Rock valve 284 Rockschieber EN fm 01 17 01...
Page 305: ...4 15 Multi part pumping pistons optional Mehrteilige Foerderkolben EN fm 01 00 02 303 Fig 204...
Page 306: ...4 15 Multi part pumping pistons optional 304 Mehrteilige Foerderkolben EN fm 01 00 02...
Page 313: ...4 16 Servicing the pumping line Wartung Foerderleitung EN fm 01 15 01 311 Fig 208 Fig 209...
Page 325: ...4 16 Servicing the pumping line Wartung Foerderleitung EN fm 01 15 01 323 Fig 214...
Page 326: ...4 16 Servicing the pumping line 324 Wartung Foerderleitung EN fm 01 15 01...
Page 354: ...4 20 Repair welding 352 Reparaturschweissen EN fm 01 05 01...
Page 355: ...Trennblatt_Kapitel Fernsteuerung EN fm 353 5 Remote control...
Page 356: ...5 Remote control 354 Trennblatt_Kapitel Fernsteuerung EN fm 01 00 00...
Page 365: ......
Page 366: ......
Page 368: ......
Page 371: ......
Page 374: ...6 Special equipment 358 Trennblatt_Kapitel Sonderausstattung EN fm...
Page 380: ...6 1 Hydraulic shut off assembly 98383777 364 Hydraulischer Absperrschieber EN fm 01 00 01...
Page 392: ...6 3 Remote pressure cut off DAF 376 Druckabschneidung fernverstellbar EN fm 01 00 00...
Page 393: ...Trennblatt_Kapitel Anhang EN fm 377 7 Appendix...
Page 394: ...7 Appendix 378 Trennblatt_Kapitel Anhang EN fm...
Page 416: ...7 3 Always Ready 400 Always Ready EN fm 01 01 01...
Page 418: ...7 4 VDMA safety manual 402 Vorwort Sicherheitshandbuch VDMA EN fm 01 00 01...
Page 419: ...Safety Manual Concrete delivery and placing machines 01 2018 Rev16 EN...
Page 426: ...8 01 2018 Rev16 EN...
Page 428: ...10 01 2018 Rev16 EN...
Page 448: ...30 01 2018 Rev16 EN...
Page 474: ...56 01 2018 Rev16 EN...
Page 476: ...58 01 2018 Rev16 EN...
Page 490: ...72 01 2018 Rev16 EN...
Page 491: ......
Page 492: ......