Operation
BASCSOUL_EN
V02 | 10.2017
34
5.4
Switching on
5.4.1
Coffee machine
5.4.2
Optional accessories
Option: Side cooling unit
► Check the machine mains connection.
► Unlock the user panel and slide it upwards until it snaps into place.
► Briefly press power button [A].
The machine starts up.
The main screen appears, and the machine begins to heat up.
The machine is ready for use as soon as the required temperature is reached.
► Close the user panel.
See also "Operation" - "User panel" – "Open or close user panel".
When the machine is switched on for the first time, display-guided adjustment of the machine configuration and hard-
ware calibration follows automatically.
NOTE
The machine milk hoses are taken out of the squeeze valve for transport.
When connecting the milk hoses, ensure that all connections have been correctly estab-
lished and routed.