DECK MECHANISM DISASSEMBLY
4-7
Opener Lid
Arm
Assembly
Pinch
Base Assembly P4
Arm T/up
Lever T/up
(A)
(B)
(C)
(C)
(H13)
(B)
(H13)
Chassis
Fig. A-5
16. Base assembly P4 (Fig. A-5-1)
1) Breakaway the (A) portion of the Base assembly P4 from
the Embossing of the Chassis.
2) Turn the Base assembly P4 to counterclockwise direction
and lift it up.
17. Opener Lid (Fig. A-5-2)
1) Breakaway the (B) portion of the Opener Lid from the
Embossing of the Chassis.
2) Turn the Opener Lid to clockwise direction and lift it up.
18. Arm assembly Pinch (Fig. A-5-3)
1) Lift the Arm assembly Pinch up.
19. Lever T/up (Fig. A-5-4)/
Arm T/up (Fig. A-5-5)
1) Unhook the Hook(H13) of the bottom Chassis and lift the
Lever T/up up.
2) Lift the Arm T/up up.
When reassembling, confirm the (C) portion of the Arm
assembly Pinch is inserted to the Chassis Hole
correctly as Fig.
Place the Mechanism face down, or up side down.
NOTE
(Fig. A-5-2)
(Fig. A-5-1)
(Fig. A-5-3)
(Fig. A-5-5)
(Fig. A-5-4)
Summary of Contents for VHR-H772EV
Page 11: ......
Page 15: ......
Page 57: ...MAINTENANCE INSPECTION PROCEDURE 4 22 GEAR F R GEAR AY P2 P3 Lever F R Base Tension Boss Cam ...
Page 90: ...MEMO ...
Page 91: ...SANYO Electric Co Ltd Osaka Japan Jun 02 K Printed in Japan ...