DECK MECHANISM DISASSEMBLY
4-3
(B)
(E)
(C1)
(C)
Plate Top
Arm Assembly F/L
Spring Lever S/W
Gear Assembly Rack F/L
Chassis
Opener Door
Brackert Assembly L/D Motor
Holder Assembly CST
(B')
(C')
(D)
(E')
(H6)
(A)
(B)
Lever Assembly S/W
(H8)
Fig. A-2
(Fig. A-2-1)
(Fig. A-2-2)
(Fig. A-2-6)
(Fig. A-2-7)
(Fig. A-2-5)
(Fig. A-2-3)
(Fig. A-2-4)
Summary of Contents for VHR-H772EV
Page 11: ......
Page 15: ......
Page 57: ...MAINTENANCE INSPECTION PROCEDURE 4 22 GEAR F R GEAR AY P2 P3 Lever F R Base Tension Boss Cam ...
Page 90: ...MEMO ...
Page 91: ...SANYO Electric Co Ltd Osaka Japan Jun 02 K Printed in Japan ...