MAINTENANCE/INSPECTION PROCEDURE
4-21
(1) Greasing guidelines
Apply grease, with a cleaning patch. Do not use excess
grease. It may come into contact with the tape transport
or drive system. Wipe any excess and clean with clean
ing patch wetted in Isopropyl Alcohol.
(2) Periodic greasing
Grease specified locations every 5,000 hours.
5-2) Greasing
NOTE:Greasing Points
3
5
6
1
2
4
1) Loading Path Inside & Top side
2) Base Tension Boss inside Hole
3) Arm Assembly F/L "U" Groove
4) Arm Take-up Rubbing Section
5) L/D Motor Gear Wheel Part
6) Shaft
7) Arm Assembly F/L of Buming
Inside Hole
8) Reel S, T Shaft (G381:Yellow)
9) Brake T Groove
Guide Rail
Base Loading
Gear Drive
Gear Sector
Gear Cam
Gear Part
Bracket Side (L)
Bracket Assembly Door
5
7
8
1
2
6
4
3
Slider Guide
Slider Guide
1) Loading Path Inside & Top side
2) Shaft
3) Gear Rack F/L Moving Section
4) Shaft
5) Lever Tension Groove
6) Clutch Assembly D33 Shaft
7) Brake "S" Rubbing Section
Chassis (Top)
Chassis (Bottom)
Guide Rack F/L
Gear Rack F/L
Summary of Contents for VHR-H772EV
Page 11: ......
Page 15: ......
Page 57: ...MAINTENANCE INSPECTION PROCEDURE 4 22 GEAR F R GEAR AY P2 P3 Lever F R Base Tension Boss Cam ...
Page 90: ...MEMO ...
Page 91: ...SANYO Electric Co Ltd Osaka Japan Jun 02 K Printed in Japan ...