
Operating Procedures
28
After checking the startup of the UPS in step
④
, turn ON the power of the load
devices.
*2
*1. If the “
CONTROL NG
” is displayed, the UPS cannot be started because, for example, there is an input
power supply error. Check the status of “
STATUS
” in the home menu of the LCD panel and see §11.
“Troubleshooting.”
*2. Load capacity
If “
OVER LOAD
” is displayed on the LCD screen and a beep-beep-beep-beep beep-beep-beep-beep
buzzer sound can be heard when the power of the load devices is turned ON, the load devices
connected to the UPS exceed the rated capacity of the UPS. Reduce the number of connected load
devices.
Notes on UPS startup
Summary of Contents for SANUPS A11J
Page 1: ...M0009237 5 kVA Instruction Manual ...
Page 25: ...Installation and Wiring 22 Blank page ...
Page 41: ...Troubleshooting 38 Blank page ...
Page 50: ...Blank page ...
Page 51: ...Blank page ...
Page 52: ......