Follow the procedure below to start up the UPS.
②
Press .
Green: Lit
①
Set
MAIN MCCB
on the front of the UPS to “ON.”
Check that “INPUT (Green)” has
changed from blinking to always on,
and then proceed to step
②
.
①
Set this to “ON”
Green: Blinking
Lit
Green: Off
Red: Off
SANYO DENKI
SANUPS A11J
- STANDBY -
Vi=*** Fi=***
[Select]=INV ON
[Back]=Cancel
- ONLINE
****
When OK: The UPS can be
started normally.
INV ON
Control OK
3
2
Green: Lit
Green: Lit
Red: Off
Green: Lit Green: Off Red: Off
③
Press .
- STANDBY
****
④
Check that the LCD display and LEDs are in the states shown in the diagram below.
- ONLINE
****
When NG: The UPS cannot be
started.
*1
INV ON
Control NG
After approx. 5 sec.
The screen changes
after approx. 1 sec.
Green: Off
Breakers are displayed enclosed in like
MAIN MCCB
, and LEDs of the LCD panel and unit
control panel are indicated as “Green INPUT”
and “Red ALARM”, and the lighting states are
indicated as follows
: LED lights.
: LED blinks.
The states and measurement values of the UPS
are indicated as “
***
” on the LCD screen.
Indications of breakers, LEDs,
and LCD in this manual
Green: Green: Off Red: Off
Blinking
Lit
↓
Summary of Contents for SANUPS A11J
Page 1: ...M0009237 5 kVA Instruction Manual ...
Page 25: ...Installation and Wiring 22 Blank page ...
Page 41: ...Troubleshooting 38 Blank page ...
Page 50: ...Blank page ...
Page 51: ...Blank page ...
Page 52: ......