17
PJ-NET ORGANIZER
OWNER'S MANUAL
ENGLISH
Connection of LAN cable
To connect to the network, it is required to use the UTP (Unshielded Twisted Pair)
straight cable with RJ-45 plug. There are two different types of cables depending on
whether the network is constructed with 10Base-T or 100Base-TX. Prepare the Hub
(10Base-T or 100Base-TX) to distribute the network cable if required.
1
Disconnect the AC plug from the
projection monitor.
2
Connect the UTP straight cable
to the LAN port on the Network
Unit.
3
Connect the UTP straight cable to the hub.
✐
Use the UTP cross cable when you connect the computer and projection monitor directly not
using the hub.
✐
When you connect the projection monitor into the 10Base-T network, use cable with category
3 or 5. When you connect the projection monitor into the 100Base-TX network, use cable with
category 5.
✐
The length of cable between hub and projection monitor should be less than 100m.
LINK
POWE
R
ACT
PJ-N
et
Org
aniz
er
Hub
(10Base-T, 100Base-TX)
UTP straight cable
Projection monitor
Installation and network configuration
Summary of Contents for PJ-Net Organizer POA-PN30
Page 1: ...OWNER S MANUAL PJ Net Organizer MODEL No POA PN30 LINK POWER ACT PJ Net Organizer ...
Page 6: ...6 ...
Page 12: ...12 Chapter 1 Preparation ...
Page 22: ...22 Chapter 2 Installation ...
Page 58: ...58 Chapter 4 Controlling the Projection Monitor ...
Page 84: ...Printed in Japan 1AA6P1P4814 IDZL SANYO Electric Co Ltd ...