System Design
6. Sound-proofing measures
D-26
(1) Installation location and sound-proofing measures
If no suitable installation location is available and it is necessary to install in a confined location where there
are houses, offices or other buildings nearby, it may be necessary to provide sound barrier walls, sound
absorption chambers or other secondary sound-proofing measures.
Secondary sound-proofing measure include:
•
Attenuation over distance
•
Sound-proofing with noise barriers
•
Sound-proofing using sound absorbing chambers
•
Sound-proofing by vibration isolation (anti-vibration pads, flexible couplings, etc.)
The following criteria are from Tokyo Pollution Prevention Regulations.
Criteria for everyday sound levels
Ordinary standards
Special
standards
Morning Daytime Evening Night
Condition
Area type
Sound
level
(phon)
Time
Sound
level
(phon)
Time
Sound
level
(phon)
Time
Sound
level
(phon)
Time
Near schools
and hospitals
(approx. 50m)
Type 1
Residential and
school areas, etc.
40
45
40
40
Same as at left
Type 2
Residential and
undesignated
areas
45 50
8 AM to
7 PM
45
7 PM to
11 PM
45
Type 3
Commercial, light
industrial, industrial
areas
55 60 55 50
11 PM to
6 AM
Type 4
Shopping areas
and specially
designated areas
60
6 AM to
8 AM
70
8 AM to
8 PM
60
8 PM to
11 PM
55
At least 5 phon
lower than at left
(2) Attenuation of sound over distance
The figure at the right shows sound attenuation over
distance. (Figure 1)
Operating sound is measured 1m from its source.
Example. For a type 280 outdoor unit, the sound level in
the 50-Hz range at 3m distance is specified as
56 dB(A). In Figure 1, follow the 3m distance
line downwards to where it crosses the slope
(a), and then horizontally to point (b) at the left
to find the attenuation of 6.8 dB(A).
Therefore, 56 – 6.8 = 49.2 dB(A)
Summary of Contents for ECO G SGP-EW120M2G2W
Page 3: ...A 1 System Configuration Contents 1 Type Configuration 1 Outdoor unit A 2 ...
Page 12: ...Outdoor Unit 3 External Dimensions B 8 ...
Page 13: ...Outdoor Unit 4 Wiring Diagram B 9 ...
Page 14: ...Outdoor Unit 5 Performance Characteristics B 10 Cooling Heating SGP EW120M2G2W ...
Page 15: ...Outdoor Unit 5 Performance Characteristics B 11 Cooling Heating SGP EW150M2G2W ...
Page 16: ...Outdoor Unit 5 Performance Characteristics B 12 Cooling Heating SGP EW190M2G2W ...
Page 17: ...Outdoor Unit 5 Performance Characteristics B 13 Cooling Heating SGP EW240M2G2W ...
Page 18: ...Outdoor Unit 6 Operating Sound Level Characteristics B 14 1 Standard Mode ...
Page 19: ...Outdoor Unit 6 Operating Sound Level Characteristics B 15 ...
Page 20: ...Outdoor Unit 6 Operating Sound Level Characteristics B 16 ...
Page 21: ...Outdoor Unit 6 Operating Sound Level Characteristics B 17 ...
Page 22: ...Outdoor Unit 6 Operating Sound Level Characteristics B 18 2 Quiet Mode ...
Page 23: ...Outdoor Unit 6 Operating Sound Level Characteristics B 19 ...
Page 24: ...Outdoor Unit 6 Operating Sound Level Characteristics B 20 ...
Page 25: ...Outdoor Unit 6 Operating Sound Level Characteristics B 21 ...
Page 28: ...Control Related 1 System Block Diagram C 2 ...
Page 29: ...Control Related 2 Remote Control Warning List C 3 ...
Page 30: ...Control Related 2 Remote Control Warning List C 4 ...
Page 31: ...Control Related 2 Remote Control Warning List C 5 ...
Page 76: ...Installation Work 1 Points regarding refrigerant pipe work E 3 APR P680BG ...
Page 77: ...Installation Work 1 Points regarding refrigerant pipe work E 4 APR P1350BG ...
Page 78: ...Installation Work 1 Points regarding refrigerant pipe work E 5 APR CHP680BG APR CHP1350BG ...
Page 86: ...Installation Work 2 Points regarding electrical work outdoor unit E 13 ...
Page 87: ...Installation Work 3 Outdoor unit installation work E 14 ...
Page 88: ...Installation Work 3 Outdoor unit installation work E 15 ...
Page 89: ...Installation Work 3 Outdoor unit installation work E 16 ...
Page 90: ...Installation Work 3 Outdoor unit installation work E 17 ...
Page 91: ...Installation Work 3 Outdoor unit installation work E 18 ...
Page 92: ...Installation Work 3 Outdoor unit installation work E 19 ...
Page 93: ...Installation Work 3 Outdoor unit installation work E 20 ...
Page 94: ...Installation Work 3 Outdoor unit installation work E 21 ...
Page 95: ...Installation Work 3 Outdoor unit installation work E 22 ...
Page 96: ...Installation Work 3 Outdoor unit installation work E 23 ...
Page 97: ...Installation Work 3 Outdoor unit installation work E 24 ...
Page 98: ...Installation Work 3 Outdoor unit installation work E 25 ...
Page 99: ...Installation Work 3 Outdoor unit installation work E 26 ...
Page 100: ...Installation Work 3 Outdoor unit installation work E 27 ...
Page 101: ...Installation Work 3 Outdoor unit installation work E 28 ...
Page 102: ...Installation Work 3 Outdoor unit installation work E 29 ...
Page 103: ...Installation Work 3 Outdoor unit installation work E 30 ...
Page 104: ...Installation Work 3 Outdoor unit installation work E 31 ...
Page 105: ...Installation Work 3 Outdoor unit installation work E 32 ...
Page 106: ...Installation Work 3 Outdoor unit installation work E 33 ...