Outdoor Unit
1. Gas Usage Conditions
B-2
(1) Usable Gas
1) Depending upon the calorific value of the natural gas, the setting for the gas fuel flow rate adjustment nozzle
will differ.
(2) Gas Supply Pressure
Units: mbar
Gas Type
Maximum
Standard
Minimum
P 45
37
25
H, L, E
25
20
17
(3) Applicable Gas Type
Group P
H
L
E
Gas composition
Standard gas
Calorific value
(MJ/m
3
N)
C
3
H
8
100%
G31
95.65
CH
4
100%
G20
37.78
CH
4
86% N
2
14%
G25
32.49
CH
4
100%
G20
37.78
Type 120
○
◎
○
○
Type 150
○
◎
○
○
Type 190
○
◎
○
○
Model
Name
Type 240
○
◎
○
○
Applicability
◎
: Standard setting when shipped from the factory
○
: Necessary to change the gas type setting on site
(4) Gas Maximum Flow Volume
Outdoor unit
Gas Maximum Flow
Volume (kW)
Type 120
43
Type 150
57
Type 190
69
Type 240
80
The gas maximum flow volume is the quantity of gas consumed after start up and operating at full
capacity, with the gas at 40
o
C and at standard pressure.
Summary of Contents for ECO G SGP-EW120M2G2W
Page 3: ...A 1 System Configuration Contents 1 Type Configuration 1 Outdoor unit A 2 ...
Page 12: ...Outdoor Unit 3 External Dimensions B 8 ...
Page 13: ...Outdoor Unit 4 Wiring Diagram B 9 ...
Page 14: ...Outdoor Unit 5 Performance Characteristics B 10 Cooling Heating SGP EW120M2G2W ...
Page 15: ...Outdoor Unit 5 Performance Characteristics B 11 Cooling Heating SGP EW150M2G2W ...
Page 16: ...Outdoor Unit 5 Performance Characteristics B 12 Cooling Heating SGP EW190M2G2W ...
Page 17: ...Outdoor Unit 5 Performance Characteristics B 13 Cooling Heating SGP EW240M2G2W ...
Page 18: ...Outdoor Unit 6 Operating Sound Level Characteristics B 14 1 Standard Mode ...
Page 19: ...Outdoor Unit 6 Operating Sound Level Characteristics B 15 ...
Page 20: ...Outdoor Unit 6 Operating Sound Level Characteristics B 16 ...
Page 21: ...Outdoor Unit 6 Operating Sound Level Characteristics B 17 ...
Page 22: ...Outdoor Unit 6 Operating Sound Level Characteristics B 18 2 Quiet Mode ...
Page 23: ...Outdoor Unit 6 Operating Sound Level Characteristics B 19 ...
Page 24: ...Outdoor Unit 6 Operating Sound Level Characteristics B 20 ...
Page 25: ...Outdoor Unit 6 Operating Sound Level Characteristics B 21 ...
Page 28: ...Control Related 1 System Block Diagram C 2 ...
Page 29: ...Control Related 2 Remote Control Warning List C 3 ...
Page 30: ...Control Related 2 Remote Control Warning List C 4 ...
Page 31: ...Control Related 2 Remote Control Warning List C 5 ...
Page 76: ...Installation Work 1 Points regarding refrigerant pipe work E 3 APR P680BG ...
Page 77: ...Installation Work 1 Points regarding refrigerant pipe work E 4 APR P1350BG ...
Page 78: ...Installation Work 1 Points regarding refrigerant pipe work E 5 APR CHP680BG APR CHP1350BG ...
Page 86: ...Installation Work 2 Points regarding electrical work outdoor unit E 13 ...
Page 87: ...Installation Work 3 Outdoor unit installation work E 14 ...
Page 88: ...Installation Work 3 Outdoor unit installation work E 15 ...
Page 89: ...Installation Work 3 Outdoor unit installation work E 16 ...
Page 90: ...Installation Work 3 Outdoor unit installation work E 17 ...
Page 91: ...Installation Work 3 Outdoor unit installation work E 18 ...
Page 92: ...Installation Work 3 Outdoor unit installation work E 19 ...
Page 93: ...Installation Work 3 Outdoor unit installation work E 20 ...
Page 94: ...Installation Work 3 Outdoor unit installation work E 21 ...
Page 95: ...Installation Work 3 Outdoor unit installation work E 22 ...
Page 96: ...Installation Work 3 Outdoor unit installation work E 23 ...
Page 97: ...Installation Work 3 Outdoor unit installation work E 24 ...
Page 98: ...Installation Work 3 Outdoor unit installation work E 25 ...
Page 99: ...Installation Work 3 Outdoor unit installation work E 26 ...
Page 100: ...Installation Work 3 Outdoor unit installation work E 27 ...
Page 101: ...Installation Work 3 Outdoor unit installation work E 28 ...
Page 102: ...Installation Work 3 Outdoor unit installation work E 29 ...
Page 103: ...Installation Work 3 Outdoor unit installation work E 30 ...
Page 104: ...Installation Work 3 Outdoor unit installation work E 31 ...
Page 105: ...Installation Work 3 Outdoor unit installation work E 32 ...
Page 106: ...Installation Work 3 Outdoor unit installation work E 33 ...