System Design
7. Center-of-gravity and earthquake resistance
D-40
(3) Installation position and center of gravity
■
Outdoor Unit
1) Position of center-of-gravity
Position of
mounting points
Position of center-of-gravity
Unit Weight (kg)
Outdoor unit
type
L
1
L
2
L
G1
L
G1´
L
G2
L
G2´
h
G
W multi model
Type
120
1,000
1,014 441 559 510 504 880
790
Type
150
1,000
1,014 441 559 510 504 880
790
Type
190 1,000 1,014 443 557 508 506 670
820
Type 240
1,000
1,014
443
557
508
506
680
850
For earthquake-resistant design, compare L
G1
and L
G1'
, and L
G2
and L
G2'
, and use the smallest value.
2) Mounting pad (foundation) size
Size
A B C
Ground based
At least
1,150
At least
120
Anti-vibration mount
(none)
At least
1,850
At least
1,450
Anti-vibration mount
(stand-alone type)
At least
2,000
At least
1,600
Type 120
Type 150
Type 190
Type 240
Roof
mounted
Anti-vibration mount
(interconnected type)
1,850 1,600
At least
140
Note: The foundation is either a solid pad, or directly on the floor slab.
3) Size and type of anchor bolts
i) All anchor bolts are M12.
ii) Use one of the following types of anchor bolts.
Embedded-type: L-type, LA-type, headed bolts, J-type, JA-type
Boxout-compatible: L, LA, headed, J or JA (however, base dimension C must be at least 180 mm),
post-drilled resin anchors or post-installed male-threaded mechanical anchor bolts.
Female screw anchors provide insufficient pull-out strength, so cannot be used.
L
G
2
h
G
L
2
L
G
2
´
L
G1
h
G
L
1
L
G1´
A
B
C
Broadside (front view)
End-on (side view)
Summary of Contents for ECO G SGP-EW120M2G2W
Page 3: ...A 1 System Configuration Contents 1 Type Configuration 1 Outdoor unit A 2 ...
Page 12: ...Outdoor Unit 3 External Dimensions B 8 ...
Page 13: ...Outdoor Unit 4 Wiring Diagram B 9 ...
Page 14: ...Outdoor Unit 5 Performance Characteristics B 10 Cooling Heating SGP EW120M2G2W ...
Page 15: ...Outdoor Unit 5 Performance Characteristics B 11 Cooling Heating SGP EW150M2G2W ...
Page 16: ...Outdoor Unit 5 Performance Characteristics B 12 Cooling Heating SGP EW190M2G2W ...
Page 17: ...Outdoor Unit 5 Performance Characteristics B 13 Cooling Heating SGP EW240M2G2W ...
Page 18: ...Outdoor Unit 6 Operating Sound Level Characteristics B 14 1 Standard Mode ...
Page 19: ...Outdoor Unit 6 Operating Sound Level Characteristics B 15 ...
Page 20: ...Outdoor Unit 6 Operating Sound Level Characteristics B 16 ...
Page 21: ...Outdoor Unit 6 Operating Sound Level Characteristics B 17 ...
Page 22: ...Outdoor Unit 6 Operating Sound Level Characteristics B 18 2 Quiet Mode ...
Page 23: ...Outdoor Unit 6 Operating Sound Level Characteristics B 19 ...
Page 24: ...Outdoor Unit 6 Operating Sound Level Characteristics B 20 ...
Page 25: ...Outdoor Unit 6 Operating Sound Level Characteristics B 21 ...
Page 28: ...Control Related 1 System Block Diagram C 2 ...
Page 29: ...Control Related 2 Remote Control Warning List C 3 ...
Page 30: ...Control Related 2 Remote Control Warning List C 4 ...
Page 31: ...Control Related 2 Remote Control Warning List C 5 ...
Page 76: ...Installation Work 1 Points regarding refrigerant pipe work E 3 APR P680BG ...
Page 77: ...Installation Work 1 Points regarding refrigerant pipe work E 4 APR P1350BG ...
Page 78: ...Installation Work 1 Points regarding refrigerant pipe work E 5 APR CHP680BG APR CHP1350BG ...
Page 86: ...Installation Work 2 Points regarding electrical work outdoor unit E 13 ...
Page 87: ...Installation Work 3 Outdoor unit installation work E 14 ...
Page 88: ...Installation Work 3 Outdoor unit installation work E 15 ...
Page 89: ...Installation Work 3 Outdoor unit installation work E 16 ...
Page 90: ...Installation Work 3 Outdoor unit installation work E 17 ...
Page 91: ...Installation Work 3 Outdoor unit installation work E 18 ...
Page 92: ...Installation Work 3 Outdoor unit installation work E 19 ...
Page 93: ...Installation Work 3 Outdoor unit installation work E 20 ...
Page 94: ...Installation Work 3 Outdoor unit installation work E 21 ...
Page 95: ...Installation Work 3 Outdoor unit installation work E 22 ...
Page 96: ...Installation Work 3 Outdoor unit installation work E 23 ...
Page 97: ...Installation Work 3 Outdoor unit installation work E 24 ...
Page 98: ...Installation Work 3 Outdoor unit installation work E 25 ...
Page 99: ...Installation Work 3 Outdoor unit installation work E 26 ...
Page 100: ...Installation Work 3 Outdoor unit installation work E 27 ...
Page 101: ...Installation Work 3 Outdoor unit installation work E 28 ...
Page 102: ...Installation Work 3 Outdoor unit installation work E 29 ...
Page 103: ...Installation Work 3 Outdoor unit installation work E 30 ...
Page 104: ...Installation Work 3 Outdoor unit installation work E 31 ...
Page 105: ...Installation Work 3 Outdoor unit installation work E 32 ...
Page 106: ...Installation Work 3 Outdoor unit installation work E 33 ...