Machine Operation
SY215C LC/SY225C LC Excavator OMM
4-20
Operation and Maintenance Manual — 1219
SANY
Engine Shutdown Procedure
1. Park the machine on a flat, level, stable surface.
2. Lower the work equipment to the ground.
3. Adjust the throttle control dial to MIN (low idle) and allow the engine to idle for 5 minutes to cool down.
4. Turn the key switch to OFF.
5. With the engine off and the key in the ON position, raise the hydraulic control lever to the unlocked (open)
position and operate all hydraulic controls to relieve the hydraulic system pressure.
6. Turn the key switch to OFF and remove the key. Put the hydraulic lockout control lever back to the locked
(closed) position.
Inspection After Engine Shutdown
1. After shutting down the engine, conduct a walk-around inspection. Check the work equipment, the exterior of
the machine, and the undercarriage.
2. Check all fluid and oil levels.
3. Fill the fuel tank with diesel fuel. See “Fill the Fuel Tank” on page 5-57.
4. To prevent fires, clear the engine compartment of combustible debris.
1. Clean mud from the tracks and undercarriage.
NOTICE!
• To avoid accelerated engine component wear, always allow the engine to idle for 5 minutes
to decrease the engine temperature before shutting the engine off. Never abruptly shut
down the engine, except in an emergency.
• Never stop the engine suddenly when it is overheated. Run the engine at low idle to allow
the engine to cool gradually before shutting it down.
Failure to follow this notice could damage the machine or cause it to operate improperly.