26
3.3 Indication of the next maintenance procedure
Gives the date of the next maintenance procedure, a reminder on the
screen will be displayed on the scheduled date.
Maintenance frequencies are different depending on the area of use of the
station (according to EN12056-4) :
• Collective : 3 months • Commercial : 6 months • Individual : 12 months
Press OK to confirm the type of use.
10:48:50
AC
Collective
– – – – Maintenance – – – –
Next: APRIL 2017
Commercial
Individual
OK
3.2 Setting the time delay
Allows optimised pumping times as a function of the total dynamic head
The motor activation time is pre-set to 30 seconds. After thirty seconds of
continuous operation, the second motor is activated to reinforce the first
one. If this parameter is too long (for the client), it is possible to change
(increase or decrease) the delay.
10:48:42
AC
4s
Pump delay
Pump delay P2
30s
OK
– – – – Pump delay – – – –
3. Setting parameters
Allows certain parameters to modified to optimise the operation of the pumping station.
3.1 Setting the date and time
Parameter required for alarm management,
history and maintenance periods. The date and
time will be saved as soon as they are validated
with OK.
Up and down arrow to
increase or decrease
Left and right arrow to
change from day to
month, to year, to hour,
to minute ... until OK
which will validate the
entry.
SETTINGS
› ›
10:48:20
AC
P1
P2
10:48:30
AC
➤
➤
➤
➤
29
DECEMBER 2016
10 h : 48 mn : 30s
OK
– – – –Hour/Date – – – –
P1
P2
➤
➤
➤
➤
10:47:10
AC
– – – SETTINGS – – –
Hour/Date
Pump delay
Maintenance
Version
BMS
››
› ›
6.7 Option of connection to an external alarm
Option of a remote alarm facility : dry contact
(no voltage)
. This contact opens (Normally Closed contact)/
closes (Normally Opened contact) as soon as the station is in alarm mode and remains opened/closed as long
as the default has not been corrected.
The terminals can be connected to a BMS (Building Management System) system or to a live system (max. AC
250 V / 16 A, DC 300 V/17 A).
2.2 Running time of pumps
Quantifies the running time of the
motors since their first use (TOTAL),
the number of starts and the
maximum operating time (PMAX).
P1
P2
➤
➤
➤
➤
10:47:10
AC
LOGS
Alarm list
Time pump
››
› ›
10:47:35
AC
P1 MAX:17 s
Nbr of Starts: 9521
TOTAL: 38 h 45 mn 6 s
P2 MAX: 15 s
Nbr of Starts: 9520
TOTAL: 36 h 16 mn 38 s