9
,
. HANDLING
• When unit received, unpack and make sure the packaging is intact; any defect may indi-
cate damage to the equipment. Review it carefully to make sure that no parts are mis-
sing.
• If there is any damage to the unit or the shipment is not complete, write down the pro-
blems on the delivery slip and send a claim to the carrier. Also report any problems to
S&P.
Filtering section
The fi ltering section has one fl at fi lters made from galvanised steel frame.
This section includes an specifi c rail to fi t a second fi lter (supplied as an accessory).
Prefi lters
Mounting system via rails included.
Available prefi lters (accessories): G4/M5.
Final fi ltration
Mounting system via fast-clamps that allow a perfect thightness with the unit frame.
Standard fi lter (supplied with the unit): F7.
Available fi lters F6, F8 or F9 fi lters with an effi ciency level above 60%.
The fi lters have been manufactured according to UNE 779:2013.
• Components should be transported using appropriate hoist and slings. The equipment
has corner lugs for loading and unloading.
• The UTBS PRO-REG units are delivered bolted in pallets.
Summary of Contents for UTBS PRO-REG Series
Page 1: ...SERIE UTBS PRO REG EN...
Page 2: ......
Page 29: ...29 10 CONTROL DIAGRAM Version with electric batteries...
Page 30: ...30 Versions with hot and or cold water coils...
Page 31: ...31 Versions with reversible water coil...
Page 62: ...62 22 WIRING DIAGRAMS...
Page 63: ...63...
Page 64: ...64...
Page 65: ...65...
Page 66: ...66...
Page 67: ...67...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...