4-3. Setting value change rate (SLOPE) operation
● The set value is changed by fixed changing rate from the now present value (PV) to set value when the set value is changed.
70.0℃
30.0℃
TSP
PV
SP change
SP
2minutes.
40.0℃
Change rate (Slope) operation
References
▶
Operation method: Stationary operation
▶
Temperature change rate: 20.0℃/Min
▶
Change [Changed SP(TSP) - PV at the SP changing point] with slope of 20.0℃
per minute: (70.0-30.0)℃ = Change 40.0℃ with the slope of 20℃
▶
Increase the current set value (SP) from 30.0℃ to 70.0℃ with uniform
increasing rate for 2 minutes.