16
ԙ
The logo displaying screen and the initial screen are displayed sequentially when the electric power is switched ON after installation of the product and
it converts to the graph recording screen automatically.
ԙ
It takes about 20 seconds in screen loading
ԙ
When button is pressed at the top of the graph recording screen, the sub menu bar is displayed and when is pressed, it converts to the main screen.
2-3. Basic operation flow chart
Loading screen
System parameter setting screen
Password input screen
Main screen
Initial screen
Graph recording screen
Summary of Contents for SDR100E Series
Page 23: ...Main screen Part 03...
Page 25: ...4 1 Graph recording screen 24 Graph recording setting Part 04...
Page 36: ...5 1 Graph view 35 5 2 Data searching 36 Graph searching Part 05...
Page 39: ...Function setting Part 06...
Page 51: ...Part 08 Setting canned message...
Page 53: ...Setting reserve operation Part 09...
Page 64: ...Part 11 Error history display...
Page 68: ...Part 12 Setting system parameter...
Page 70: ...13 1 Sensor input screen 69 Screen for setting the sensor input Part 13...
Page 95: ...DI function and operation Part 16...
Page 102: ...System initial setting9 Part 18...