9
● Recommended specification for electric cable: Vinyl insulated electric cable KSC3304 0.9~2.0mm2
● Recommended specification for terminal: Use the pressed terminal with insulation sleeve which is proper to the M3 screw as shown in [Fig. 1].
● Source of noise
(A) Relay and contact point
(B) Solenoid coil and solenoid valve
(C) Electric power line
(D) Induced load
(E) Inverter
(F) Commutator in motor
(G) SCR for controlling the phase angle
(H) Wireless communication device
(I) Welding machine
(J) High pressure ignition device and etc
● Solution for noise
(A) Make the wiring with caution for the following points from the noise creation source.
(B) Make the wiring for the input circuit with placing the gap from the power circuit and ground circuit.
(C) Use the shield line for the noise from the electrostatic induction.
(D) Connect the shield line to the ground terminal according to the necessity not to make the 2 point ground.
(E) Make the wiring in tight twisting for the noise from the electric induction.
1-3. Wiring
● Make the wiring after checking whether the wiring cable is applied for current with tester by switching off the main electric power in every
supplied instrument.
● Never contact to the terminal because of the risk of electric shock during application of the current (Electric power on).
● Make the wiring after switching off the main electric power certainly.
Cautions
(1) How to make the wiring
Φ
5.8mm Under
5.8mm
Under
Φ3mm Over
3mm Over
Fig.1
01. Cautions (Instructions) for safety
Summary of Contents for SDR100E Series
Page 23: ...Main screen Part 03...
Page 25: ...4 1 Graph recording screen 24 Graph recording setting Part 04...
Page 36: ...5 1 Graph view 35 5 2 Data searching 36 Graph searching Part 05...
Page 39: ...Function setting Part 06...
Page 51: ...Part 08 Setting canned message...
Page 53: ...Setting reserve operation Part 09...
Page 64: ...Part 11 Error history display...
Page 68: ...Part 12 Setting system parameter...
Page 70: ...13 1 Sensor input screen 69 Screen for setting the sensor input Part 13...
Page 95: ...DI function and operation Part 16...
Page 102: ...System initial setting9 Part 18...