Control-KIT Installation
1) Drill 4 holes on the correct position of the wall and fix the Control-KIT securely.
(refer to the dimension of figure below.)
2) Open the box and connect the cables according to the diagram.
( Wires should be pulled through the Cable-nut, before connecting to the terminal.
Refer to the figure below.)
3) Fix the cable firmly with Cable-tie after connecting.
4) Close the box.
INSTALLATION
1 2 3 4 1 2 3 4 1 2 3 4
Transformer
External Controller
(MIM-B14)
Main PBA
Terminal Block
1 2 3 4 1 2 3 4 1 2 3 4
Cable-tie
Cable-nut
• Make sure that Control-KIT should be installed within 5m from the EEV-KIT.
(Supplied wire in the Accessory box is 10m.)
• Close the box with the cover and cable-nut securely so that Control-KIT is fireproofed.
286
280
300
380
ø4.5
(Unit : mm)