![Samsung 136S Installation Manual Download Page 103](http://html.mh-extra.com/html/samsung/136s/136s_installation-manual_21064103.webp)
Confidential
3
.
Installing the Product
English 8/2019. Rev 0.0
85
3.10.6
Module and SMU Signal Cable Connection
Connect the signal cables for SMU and Module BMS’s for each module.
NOTICE
Use the proper signal cables as specified by the part numbers below.
WARNING
Rack BMS / Module BMS Damage
Do not insert both ends of the signal cable WIRE ASSY MODULE TO MODULE #1 or WIRE ASSY
MODULE TO MODULE #2 into the same Battery Module.
1.
Connect the signal cable “WIRE ASSY RACK TO MODULE” between the SMU “MODULE” connector and
Module #1 “Right Connector”.
Figure 3-90: SMU to Module #1 Signal Cable
Summary of Contents for 136S
Page 1: ...Confidential English 8 2019 Rev 0 0 LIB System for UPS Installation Manual 136S ...
Page 4: ...Confidential English 8 2019 Rev 0 0 ...
Page 10: ...Important Safety Instructions Confidential vi English 8 2019 Rev 0 0 ...
Page 18: ...Confidential Table of Contents viii English 8 2019 Rev 0 0 ...
Page 153: ...Confidential Memo ...
Page 154: ...Confidential Memo ...
Page 155: ...Confidential Memo ...
Page 156: ...www SamsungSDI com ...