5-8
EB 2430 EN
Installation
5.4.2
Pressure test
The plant operator is responsible for
performing the pressure test.
SAMSON's
After-sales Service can support you to plan
and perform a pressure test for your plant.
During the pressure test, make sure the fol-
lowing conditions are met:
Î
Do not allow the pressure to exceed the
1.5 times the pressure rating of the sen-
sor or thermowell.
Note
5.5
Insulation
To insulate cold systems, we recommend first
filling the plant and carefully rinsing it. The
regulator must not yet be insulated at this
stage.
Risk of regulator damage due to incorrect
insulation.
Î
Only insulate the regulator up to the con-
trol thermostat for medium temperatures
below 0 °C/32 °F or above
80 °C/175 °F.
1. Start up the plant and adjust the set point
(see the 'Start-up' section).
2. Shut down the plant again and let it heat
up until the condensation water has
dried off.
3. Insulate the regulator and pipes convey-
ing the process medium using insulation
material with a water vapor barrier. If an
external control line is to be routed
through the insulation, special care must
be taken with the sealing since slight
changes in shape may occur. The insula-
tion thickness depends on the medium
temperature and the ambient conditions.
50 mm is a typical thickness.
NOTICE
!
Summary of Contents for series 43
Page 34: ...7 4 EB 2430 EN...
Page 42: ...10 2 EB 2430 EN...
Page 44: ...11 2 EB 2430 EN...
Page 46: ...12 2 EB 2430 EN...
Page 48: ...13 2 EB 2430 EN...
Page 50: ...14 2 EB 2430 EN 1...
Page 53: ......
Page 54: ......
Page 55: ......