![Samson Media 7 Mounting And Operating Instructions Download Page 32](http://html.mh-extra.com/html/samson/media-7/media-7_mounting-and-operating-instructions_805914032.webp)
32
EB 9510 EN
Mounting and start-up
5 Mounting and start-up
Risk of damage to the device due to incorrect
mounting position.
−
Keep rear blow-out opening clear.
−
Mount the device in the upright position
only:
5.1
Preparation for installation
Proceed as follows:
Î
Flush the pipeline thoroughly before in-
stallation of the Media 7 device.
Î
Check the Media 7 device to make sure
that it is clean and not damaged.
The plant operator is responsible for clean-
ing the pipelines in the plant.
5.2
Mounting the Media 7 de
-
vice
The following options to mount the Media 7
in the plant are available:
−
Two M8 tapped holes in the dp cell (see
Fig. 6, 1)
−
Two through holes for M8 screws in the
valve block (see Fig. 6, 2)
Î
Mounting material for pipe and wall
mounting as accessories (
u
Î
Drill pattern for wall/panel mounting:
see section 3.7.
Additional points that apply concerning in-
stallation:
Î
Mount the device to a pipe, wall or
mounting plate free of vibration.
Î
Use mounting part with clamp for pipe
mounting to attach it to a vertical or hori-
zontal pipe.
Î
Use a mounting part without clamp for
wall mounting.
1
2
2
1
3
3
4
4
1 M8 tapped hole
2 Through hole for M8 screw
3
Screw fitting for measuring line (dp cell)
4
Screw fitting for measuring line (valve block)
5 Screw plug
5
5
Fig. 6:
Fastening holes and measuring line connections of Media 7
NOTICE
!
Note
Summary of Contents for Media 7
Page 88: ...88 EB 9510 EN Annex ...
Page 89: ...EB 9510 EN 89 ...
Page 90: ...90 EB 9510 EN ...
Page 91: ...EB 9510 EN 91 ...
Page 92: ...92 EB 9510 EN ...
Page 93: ...EB 9510 EN 93 ...
Page 94: ......
Page 95: ......