8
•
Open the cover of the
GLACIÄR MIDI
, fit the cable glands and make the required electrical connections. The plug-in
terminals can be removed from the device to facilitate wiring.
•
Power the device on and complete the settings using the rotary switch, as described in the following paragraphs, or using the
app, as described below or through the Modbus connection.
•
Use the cable glands provided to pass through and connect the cables to the terminals, as shown in the figure and in the
connection table below. The terminals can be removed to simplify wiring.
•
Close the cover
•
Cord range for M16 cable gland 5 - 10 mm, for M20 cable gland 7.5 - 11.3 mm
•
Use UL listed approved cable, min. 50°C, suitable for electrical rating in application
•
Tighten the cable glands with a toque of 2,5 Nm
•
Close the cover.
Summary of Contents for GLACIAR MIDI
Page 1: ...GLACI R MIDI Gas Leakage Detector for commercial and industrial applications USER MANUAL...
Page 5: ...5 2 2 Physical dimensions Built in version Remote version...
Page 29: ...29 5 4 1 Diagram of the calibration procedure...
Page 30: ...30 5 4 2 Operation of the registers for calibration...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40 Manufactured by Samon AB Modemgatan2 S 23539Vellinge Sweden www samon se...