The unit’s power network voltage must correspond to electrotechnical parameters of the unit indicated in the technical lable or in the technical
manual.
•
The unit’s voltage, power and other technical parameters are provided in the unit’s technical lable or in the technical manual. The unit must be
connected to the power network in compliance with the effective requirements and following the manufacturer’s instructions.
• The unit must be earthed according to the rules on installing electrical equipment.
•
It is prohibited to use extension wires (cables) and power network plug socket distribution devices.
• Prior to carrying out any ventilation unit installation and connection activities (until its hand-over to the customer), the unit must be disconnected
from the power network.
•
After installation of the ventilation unit, disconnection from the power network is performed through the external protection device and unit
main switch.
• The unit must be thoroughly checked against damages (execution, control, measurement nodes) during transportation before it is connected
to the power network.
•
The power cable can be replaced only by a qualified specialist upon the evaluation of the rated power and current.
The manufacturer does not assume any liability for personal injuries and property damage due to noncompliance with the
provided instructions.
5.11. START-UP RECOMMENDATIONS
5.11.1. SYSTEM PROTECTION
The control automatics of the unit have integrated protection against a short circuit of those assemblies. The controllers have the following pro
-
tectors:
MCB
F1, F2 - 1A(5x20) MCB protection;
EX2
to change depending on the product
To ensure safe maintenance of the unit, it is necessary to turn off main switch and/or external protection device.
5.11.2. PRE-STARTUP RECOMENDATIONS OF THE UNIT (IN THE PRESENCE OF THE ENDUSER)
Prior to start-up the system must be thoroughly cleaned. Check whether:
•
operation systems and unit elements as well as automation and automation devices were not damaged during installation,
•
all electrical devices are connected to power supply and fit for service,
•
all necessary automation elements are installed and connected to power supply and MCB, EX1, EX2 terminal blocks,
•
cable connection to MCB, EX1, EX2 terminal blocks comply with the existing power connection diagrams,
• all electrical equipment protection elements are properly connected (if they are additionally used),
•
cables and wires correspond to all applicable safety and functional requirements, diameters, etc.,
• earthing and protection systems are properly installed,
• condition of all seals and sealing surfaces is correct.
6. CONTROL
6.1. DEVICE CONTROL
Ventilation unit can be controlled using a remote control, web interface via MB-Gateway and building management system. More information about
the possibilities of controlling is provided in the table below.
MB-G WIFI + SALDA AIR app
Stouch
FLEX MCB
SA-Control
MB-Gateway
BMS
+
+
+
+
+
Modbus RTU
6.2. MEANING OF THE SYMBOLS USED IN THE INSTRUCTIONS AND ON THE DEVICE
ODA
outdoor air
SUP
supply air
ETA
extract air
EHA
exhaust air
6.3. MAIN DEVICE FUNCTIONS
DESCRIPTIONS OF THE FUNCTIONS
MCB
E
W
Main functions
Humidity reduction
●
●