5.
Insulation Work
5.1 Insulation material and thickness
5.1.1. Insulation material
Insulation material should adopt the material which is able to endure the pipe
’s temperature: no less than 70
Ԩ
in the high-pressure side, no less than 120
Ԩ
in the low-pressure side(For the cooling type machine, no
requirements at the low-pressure side.)
Example: Heat pump type----Heat-resistant Polyethylene foam (withstand above 120
Ԩ
)
Cooling only type----Polyethylene foam (withstand above 100
Ԩ
)
5.1.2. Thickness choice for insulation material
Insulation material thickness is as follows:
5.2 Refrigerant pipe insulation
5.2.1. Work Procedure
①
Before laying the pipes, the non-jointing parts and non-connection parts should be heat insulated.
②
When the gas proof test is eligible, the jointing area, expanding area and the flange area should be
heat insulated
5.2.2. Insulation for non-jointing parts and non-connection parts
For construction convenience, before laying pipes, use insulation material to insulate the pipes to be deal
with, at the same time, at two ends of the pipe, remain some length not to be insulated, in order to be welded
and check the leakage after laying the pipes.
5.2.3. Insulate for the jointing area, expanding area and the flange area
①
Insulate for the jointing area, expanding area and the flange area should be done after checking leakage
of the pipes
②
Make sure there
’s no clearance in the joining part of the accessorial insulation material and local
preparative insulation material.
Installation
115
wrong
right
Gas pipe and liquid pipe should
not be put together to insulate
Insulate the gas pipe
(cooling only)
Insulate the gas pipe and
liquid pipe
Pipe diameter (mm)
Adiabatic material thickness
Refrigerant pipe
Φ6.4—Φ25.4
10mm
Φ28.6—Φ38.1
15mm
Drainage pipe
Inner diamet
erΦ20—Φ32
6mm
Summary of Contents for SIB-100BAY
Page 1: ...S13 01 01 13en Light Commercial Air Conditioner R410A ON OFF Service Manual 2013 ...
Page 6: ...Light Commercial R410A on off S13 01 01 13en 2 2 Outdoor Units General Information 5 ...
Page 48: ...Light Commercial R410A on off S13 01 01 13en 4 Service Space Indoor Units Ceiling Floor 47 ...
Page 68: ...Light Commercial R410A on off S13 01 01 13en 3 Dimensions Indoor Units HSP Duct Type 67 ...
Page 69: ...Light Commercial R410A on off S13 01 01 13en Indoor Units HSP Duct Type 68 ...
Page 91: ...Light Commercial R410A on off S13 01 01 13en 5 Wiring Diagrams SOB 50VA Outdoor Units 90 ...
Page 92: ...Light Commercial R410A on off S13 01 01 13en SOB 60VA SOB 100YA Outdoor Units 91 ...
Page 93: ...Light Commercial R410A on off S13 01 01 13en SOB 140YA SOB 200YA Outdoor Units 92 ...