14| SAHP - Installation Manual
V3 June 2021US - SD667052
5.7 Refrigeration Connections
/ i-Ƃ* >Ã>ÎÉn»>iy>ÀiViV̵Õ`ÕÌiÌ>`
ÎÉn»>iy>ÀiViVÌÃÕVÌi>ÃÃiiw}ÕÀix®]
that connect the SAHP to the evaperator panel.
iVÌ}ÎÉn»V««iÀÀivÀ}iÀ>Ì««iÜÀÕÃÌLiy>Ài`
>`ÃiVÕÀi`ÕÃ}ÎÉn»y>ÀiÕÌð/ i i>Ì«Õ«µÕ`ÕÃÌ
be connected to the corresponding aluminum panel liquid line.
Incorrect orientation WILL result in compressor failure. To help
eliminate leaks, use refrigeration oil on the thread of the
ÎÉn»y>ÀiViVÌÃLivÀiÌ} Ìi}Ì iy>ÀiÕÌ°
5.8 Pipework Installation
All refrigeration pipework should be installed in accordance
with ISO 5149.
5.9
The SAHP is factory pre-charged with refrigerant R134a / 513a
ÜÌ iÕ} ÀivÀ}iÀ>ÌvÀÕ«ÌÓÈvÌv««ii}Ì i>V
way between the SAHP and the thermodynamic Panel.
Bolt
Double Panel
Single panel L bracket
Nut
Wall
50 mm Spacing
Fig 4
Double panel L bracket
Single Panel
50 mm Spacing
Wall
Bolt
Nut
Bolt
Nut
REFRIGERATION
INSTALLATION continued
SECTION 5
Fig 5
FRONT VIEW
Liquid line (left hand side)
Suction (gas) line (right hand side)