SECTION 7
COMMISSIONING
CHECK LIST
To be completed by the installer and left with the customer
/ i-Ƃ*ÃÃÌ>i`>iÛiÃÌÕÀ`ÞL>ÃiÌ >ÌÜ iwÜÌ
water can withstand the weight
Clearance spaces are retained
in accordance with the installation manual
A dedicated water supply isolation
valve has been installed
The water quality entering the cylinder has
been tested and is less than 200 ppm NaCL
The pipework for the hot water supply
has been properly insulated
In areas subject to freezing
protection has been provided
There is no hot water leaking from the
water supply/hot water supply pipes
and temperature and pressure relief valve(s)
Pipework is installed from the temperature
and pressure relief valve and the tundish to
a suitable drain with appropriate protection
to prevent discharged water from scolding people
The expansion vessel has been installed in
accordance with the installation manual and
the pressure charge of the expansion vessel
>VViÃÃi`EV >À}i`Û>Ì iÃV À>`iÀÛ>Ûi
ontop of the expansion vessel) is checked /
charged to match the pressure setting of the
pressure reducing valve
The pressure reducing valve(s)
have been discharge tested