26| SAHP - Installation Manual
V3 June 2021US - SD667052
SECTION 7
COMMISSIONING
CHECK LIST
To be completed by the installer and left with the customer
/
iVÞ`iÀ
>ÃLiiwi`]V«iÌiÞ
`À>i`>`Àiwi`ÌÀiÛi>Õv>VÌÕÀ}
>`ÃÌ>>ÌyÕÝiÃ>`Ã
The liquid line of the heat pump is correctly
connected to the liquid line of the panel evaporator
The panel evaporator has a minimum 30
O
pitch
(if installed on a vertical wall this yields a 90
O
pitch
inclination)
All refrigeration pipework has been insulated
with anti-condensation insulation (excluding
LÀ>ÃÃy>ÀiÕÌî>`À«Ã]Ì>ÀiÃÀ iÃ>Ài
present within the insulation
If a heat source has been connected to the boiler coil,
a dual thermostat and motorized isolation valve
have been installed and appropriately set up
The hot water and heat pump systems
comply with the appropriate regulations
The system has been installed and
commissioned in accordance with the
manufacturers instructions
The system controls have been demonstrated
to and understood by the customer
The manufacturers literature, including this checklist,
have been explained to and left with the customer.
Commissioning Technician signature
Customer signature
ÌVwÀÃ>ÌÃv>VÌÀÞ`iÃÌÀ>Ì>`ÀiVi«Ìv>Õv>VÌÕÀiÃÌiÀ>ÌÕÀi®