© Safe Fleet | May 2018 | All rights reserved | Part #: 700-1111 R2
Title of Document
p. 25
Verifying Calibration
Verifying Calibration
The next stage of the calibration process involves transferring the calibration files back to the AVM and verifying image
quality.
Calibrating Files on ECU
1. Put the SD card into the ECU.
2.
Power up the device. The configuration screen appears.
3. Navigate (using remote control) to the
Calibration
option and press
OK
(
).
4. Select
Manual Calibration
then click
OK
(
). The ECU will begin to load the files from the SD card.
5. Wait until the calibration process is complete. When you see the following screen, then the process is complete.