background image

Copyright Safari 4x4 Engineering Pty Ltd Melbourne Victoria Australia – www.safari4x4.com.au 

Page 9 of 12

 

 

14 

 

 

 

 

 

Apply adhesive sealant to 

the inside of the air cleaner 

base inlet and the outside of 

the air cleaner inlet adaptor 

(item 10).  

 

Install the air cleaner inlet 

adaptor into the air cleaner 

base inlet.  

 

Using the pop rivets (item 

11) secure the inlet adaptor 

to the air cleaner base. 

 

Apply sealant over the pop 

rivets to seal the pop rivets. 

 

Clean-up excess sealant to 

ensure a neat finish. 

 

 

 

 

 

 

 

15

 

INSTALLER OPTION

 :

 

 

The air cleaner base 

contains a drain valve as 

shown. The drain valve can 

permit water to enter the air 

intake. 

 

Safari advises that the drain 

valve should be sealed to 

ensure a watertight 

installation. 

 

 

Summary of Contents for SS667HF

Page 1: ...535 032 000 BRACKET UPPER MOUNTING 1 4 000 002 100 BOLT HEX 6mm x 1 0 x 14mm SEMS 2 5 000 951 300 SCREW S T 4 2mm x 16mm S S 3 6 000 960 INSERT PLASTIC 3 7 000 110 STUD 8mm x 1 25 x 25mm S S 5 8 000...

Page 2: ...g Time 150min Special Tools 114mm Hole Saw Step Drill 5 0mm 6 0mm Drill Bits Pop Rivet Gun Sikaflex 227 Adhesive Sealant Loctite 243 thread lock Masking Tape Touch up paint Prior to commencing the ins...

Page 3: ...neering Pty Ltd Melbourne Victoria Australia www safari4x4 com au Page 3 of 12 2 Remove and discard Air Deflector 3 Using a sharp knife remove and discard the perforated section from the guard panel t...

Page 4: ...e Mark all hole positions with a felt tip pen Remove the template 5 Drill a pilot hole for each of the marked hole positions Use a 114mm diameter hole saw to drill the snorkel body outlet hole Use a s...

Page 5: ...e snorkel body Item 1 mounting inserts as shown 7 Place a strip of masking tape along the A pillar panel Carefully install the snorkel body Item 1 to the guard panel With the snorkel body correctly po...

Page 6: ...mounting bracket Item 3 onto the A pillar and align the bracket with the marked bracket outline Mark the three mounting hole positions with a felt tip pen 9 Drill a pilot hole at each of the three mar...

Page 7: ...safari4x4 com au Page 7 of 12 10 Install the plastic inserts Item 6 into the 8mm diameter holes in the A pillar Secure the upper mounting bracket Item 3 to the A pillar with three self tapping screws...

Page 8: ...om the end of the air cleaner base inlet and 23mm long side and 15mm short side down from the radius of the inlet as shown Drill the two marked hole positions using a 5 0mm drill bit 13 Install the ai...

Page 9: ...ner inlet adaptor into the air cleaner base inlet Using the pop rivets item 11 secure the inlet adaptor to the air cleaner base Apply sealant over the pop rivets to seal the pop rivets Clean up excess...

Page 10: ...through the hole in the inner guard panel Loosely install the 80 100mm hose clamp item 13 onto the end of the air entry hose inside the engine bay and the 90 110mm hose clamp item 14 to the snorkel en...

Page 11: ...racket When correctly aligned fasten the snorkel body to the guard panel with body washers Item 8 and nyloc nuts Item 9 Fasten the snorkel body to the upper mounting bracket with hex bolts Item 4 19 A...

Page 12: ...2 Install the air ram assembly onto the snorkel body Align the air ram assembly and tighten the black hose clamp Item 15 21 Install the guard liner mud flap air cleaner element air cleaner lid reconn...

Reviews: