21
XL-TG10153BM-en-US Rev A · 2013-06-27 · Amendments and Errors Reserved · © SAF-HOLLAND, Inc., SAF-HOLLAND, HOLLAND, SAF,
and logos are trademarks of SAF-HOLLAND S.A., SAF-HOLLAND GmbH, and SAF-HOLLAND, Inc.
Auxiliary Battery and Cable Installation
Figure 37
Figure 36
RED 18" (457 mm) CABLE
BLACK 12" (304 mm) CABLE
RED 12" (304 mm) CABLE
RED 12" (304 mm) CABLE
TIE DOWN STRAP
BATTERY
CIRCUIT BREAKER
MASTER DISCONNECT SWITCH
12. Auxiliary Battery and
Cable Installation
IMPORTANT:
SAF-HOLLAND recommends the use of
12V Group 31 Top Stud Post AGM or heavy
duty dual purpose type batteries with a
minimum of 170 reserve capacity/1000 CCA.
1. Position the auxiliary batteries so the positive terminals
are towards the outside of the edge of the trailer.
2. Install the supplied battery tie down strap. Tighten the
nuts on the threaded bars to ensure the batteries are
securely seated.
3. Connect the red (positive) 12"(304 mm) battery cable to
the positive terminals of the battery
(Figure 36).
4. Connect the black (negative) 12"(304 mm) battery cable
to the negative terminals of the battery
(Figure 36).
IMPORTANT:
Verify the master disconnect switch is
“OFF” before connecting it to the battery.
Failure to turn the master disconnect
switch off prior to connecting power
may result in unintended pump operation
which, if not avoided, could result in
property damage.
5. Connect the red (positive) 18" (457 mm) battery cable
that is already installed on the master disconnect switch
to the positive terminal of the battery
(Figure 37).
6. Connect the red (positive) 12"(304 mm) cable that is
already installed on the circuit breaker to the positive
terminal on the battery
(Figure 37).
7. Disconnect the nut from the ground cable stud on the
back of the pump box
(Figure 38).
Figure 38
GROUND CABLE STUD