Installation, operating and maintenance manual SKIT/S-DEB
3rd print version
page 95
15 – Annex
RWO GmbH
●
Marine Water Technology
●
Bremen
●
Germany
Issue 2014-04-10
Start procedure
OK Remarks
FLUSHING
d) As soon as the system is filled, the piston
valves (pos. 5 and 15) close (no voltage
applied to either solenoid valve). The control
light "GREEN WATERDISCHARGE" lights
up in green at the automatic control box
(water outboards). Now the pump starts up
and draws from the bilge.
The 1st stage is now operational.
The pump starts and the heater is
switched on. Prerequisite: The
heater switch is set to "On".
Display in automatic mode:
BETRIEB AUTO
ENTOELEN
Display in manual mode:
BETRIEB HAND
ENTOELEN
The bypass valve (pos. 58) guides the water
to the second stage (adsorber)
The solenoid valve is currentless
The measurement valve (pos. 57) guides the
water from the sample point downstream of
the second stage to the monitor
The solenoid valve is currentless
Alarm monitor OMD alarm 1 is red "On"
The measuring cell contains air
Alarm monitor OMD alarm 2 is red "On"
The measuring cell contains air
Alarm monitor OMD system is red
The monitor reacts to air with an
alarm
The recirculation valve (pos. 23) guides the
water back to the bilge
The solenoid valve is currentless
The second stage (adsorber) is filled
Close the ventilation tap of the adsorber
housing cover
During the first 5 minutes:
The bypass valve (pos. 58) guides the water
through the second stage (adsorber)
The solenoid valve is currentless
The measurement valve (pos. 57) guides the
water from the sample point downstream of
the second stage to the monitor
The solenoid valve is currentless
Alarm monitor OMD alarm 1 is green "Off"
The measuring cell contains clean
water
Alarm monitor OMD alarm 2 is green "Off"
The measuring cell contains clean
water
Alarm monitor OMD system is green
The monitor signals "no alarm"
The recirculation valve (pos. 23) guides the
cleaned water outboards.
The solenoid valve is under voltage
After the first 5 minutes:
a) if the measurement result at sample point
"upstream of adsorber" does not exceed
14ppm (4ppm)
The bypass valve (pos. 58) guides the water
bypassing the second stage (adsorber)
The solenoid valve is under voltage
The measurement valve (pos. 57) guides the
water from the sample point upstream of the
second stage to the monitor
The solenoid valve is under voltage
Alarm monitor OMD alarm 1 is green "Off"
The measuring cell contains clear
water
Alarm monitor OMD alarm 2 is green "Off"
The measuring cell contains clear
water