Install  the  bend  with  flange  (2)    on  the  central  hole  of  the 
boiler  inserting  the  seal  (1)  with  the  round  protrusions  
facing  downwards  in  contact  with  boiler  flange  and  tighten 
using  the  screws  supplied  with  the  kit.  Fit  the  smooth  male 
end of the 60/100 concentric terminal pipe (3) until it reaches 
to  the  stop  on  the  female  end  of  the  bend  (2),  making  sure 
the internal and external sealing rings are fitted; this will en-
sure  the  connection  is  properly  sealed.    Additional    exten-
sions and bends may be installed if required using the same 
method. 
Ensure that all seals are fitted and that the outer and inner 
pipes  are  installed  so  that  all  joints  are  perfectly  sealed.   
Ensure that the terminal is installed the right way up. 
 
A lubricant may assist in overcoming the friction of the seals.  
Oils  and  conventional  greases  are  not  compatible  with  the 
EPDM  seals  used  and  should  never  be  used  for  this  pur-
pose.  Silicone sprays are compatible with EPDM and may be used.  Please contact RVR for more information. 
 
A  supporting clamp should be installed every three meters.  The flue system should be slightly inclined so that 
any condensate flows towards the boiler.  This avoids any drips from the external flue terminal. 

The maximum possible overall length after the first bend (2) is 12.9 straight and horizontal meters.  See 
the section on extended flue design for more information

 

 
Vertical kit with aluminium tile ø 60 /100 

Install the concentric flange (2) on the central hole of the boiler insert-
ing  the  seal  (1)  with  the  round  protrusions  facing  downwards  in  con-
tact  with  boiler  flange  and  tighten  using  the  screws  supplied  with  the 
kit. 
Fit the male end (smooth) of the adapter (3) in the female end of the 
concentric flange (2) until it reaches the stop on the female end of the 
flange,  making  sure  the  internal  and  external  sealing  rings  are  fitted; 
this  will  ensure  the  connection  is  properly  sealed.    Additional  exten-
sions and bends may be installed if required using the same method.   
Installing  the  flashing-  Replace  tiles  with  the  aluminium  sheet  (5), 
shaping it to ensure that the rainwater runs off.  Position the fixed half-
shell  (7)  on  the  aluminium  tile  and  insert  the  intake/exhaust  pipe  (6).  
Fit the male end (6) (smooth) of the 60/100 concentric terminal  up to 
the stop on the female end of the adapter(3), making sure that the ring 
(4)  is  already  fitted;  this  will  ensure  hold  and  joining  of  the  elements 
making up the kit. 
Ensure that all seals are fitted and that the outer and  inner pipes are 
installed so that all joints are perfectly sealed. A lubricant may assist in overcoming the friction of the seals.  Oils 
and conventional greases are not compatible with the EPDM seals used and should never be used for this pur-
pose.  Silicone sprays are compatible with EPDM and may be used.  Please contact RVR for more information. 

 

 

NB: If the terminal or extension pipes need shortening ensure that the inner pipe protrudes by 5mm with 
respect to the external pipe.

 

When the boiler is installed on an external wall, the standard horizontal concentric 60/100 flue kit will normally 
be used to flue the boiler.  This is shown in the diagram.

 

 
It is often necessary to install a longer flue system to cater  for site conditions.  There are several different flue 
system  sizes available for the Victrix 24kW boiler.  

Summary of Contents for VICTRIX 24kW X

Page 1: ...ority For Technical assistance spare parts or service call RVR Energy Technology Limited Kenmare Co Kerry Tel 064 41344 Fax 064 89520 Doc Ref ALT107 181207 Read these instructions completely before us...

Page 2: ...I S 820 Non Domestic Gas Installations All relevant Building Regulations Local Water Bye Laws IEE Wiring Regulations Health Safety legislation This appliance meets the requirements of IPX4D ie degree...

Page 3: ...Immergas 80 litre T 30 C in accordance with EN 625 1 min 20 2 Specific range D UB Immergas 105 litre T 30 C in accordance with EN 625 1 min 22 0 Specific range D UB Immergas 120 litre T 30 C in accord...

Page 4: ...uctions Dimensions Victrix 24kW X Key V Electrical connection G Gas supply RU Cylinder return optional MU Cylinder flow optional RR System filling SC Condensate drain min internal diameter 13mm R Syst...

Page 5: ...ectrode 21 Safety thermostat 4 Gas valve 13 Air intake pipe 22 Air valve 5 Voltage transformer 14 Negative signal pressure point 23 Boiler circulating pump 6 Fan 15 Positive signal pressure point 24 S...

Page 6: ...heating tank and connected to terminals 36 and 37 If this cable is routed in close proximity to cables carry ing mains voltages then screened cable should be used The resistor connected to terminals...

Page 7: ...with the round protrusions facing downwards in con tact with boiler flange and tighten using the screws supplied with the kit Fit the male end smooth of the adapter 3 in the female end of the concent...

Page 8: ...he fe male end of the flanges 3 4 Fit the male end of the intake terminal 6 up to the stop on the female end of the bend 5 making sure that the relevant internal and external sealing rings are fitted...

Page 9: ...g tables The resistance factor varies depending on whether the component in question conveys fresh inlet air or hot combustion gases All boilers have a maximum resistance factor of 100 The sum of all...

Page 10: ...nces Component Resistance Quantity Total 80mm Intake pipe 0 87 9 7 83 90 air intake bend 1 9 3 5 7 80mm Flue pipe 1 2 6 7 2 90 Flue bend 2 6 2 5 2 25 93 Total Flue Resistance In this case the total re...

Page 11: ...terminal is fitted within 850 mm of a plastic or painted gutter or 450 mm of painted eaves or 300 mm of a plastic car port roof an aluminium shield at least 1 m long should be fitted to the underside...

Page 12: ...iler may be installed in any room or internal space although particular attention is drawn to the re quirements of the current IEE Wiring Regulations Where a room sealed boiler is installed in a room...

Page 13: ...orporated into the boiler is pre charged to 1 0 bar and is suitable for a sealed heating system with a maximum water content of 80 litres 18 gal Above 80 litres consideration should be given to fittin...

Page 14: ...to heat the hot water tank adequately The hot water only position on the boiler is not in use for this configuration Filling the central heating system The system design pressure cold should be set to...

Page 15: ...appliance with wet hands or other parts of the body and never touch when barefoot never pull electrical cables or leave the appliance exposed to atmospheric agents rain sunlight etc the appliance pow...

Page 16: ...cleaning function symbol Malfunction symbol combined with error code Flame present symbol Burner output scale symbol Fault and anomaly signalling The Victrix 24 kW boiler indicates any malfunctions us...

Page 17: ...valve No pressure variation must occur in the next five minutes on the gauge Ensure activation of the device for protection against the ionisation flame control gas activation time must be less than...

Page 18: ...Page 18 Victrix 24kW X Instructions Variable Heat Output Victrix 24kW X...

Page 19: ...Page 19 Victrix 24kW X Instructions Victrix 24kW X Wiring Diagram...

Reviews: