RVR Energy Technology VICTRIX 24kW X Instruction Booklet Download Page 17

Page 17 

 

 

Victrix 24kW X Instructions 

Annual maintenance procedures 

The following checks and maintenance should be performed at least once a year. 
 
- Clean the flue side of the heat exchanger. 
 
- Clean the main burner. 
 
- Make a visual inspection of the flue extraction hood for wear or corrosion. 
 
- Ensure correct ignition and operation. 
 
- Ensure correct settings of the burner in domestic water and heating modes. 
 
- Verify correct operation and adjustment of the boiler, in particular: 
 

- operation of the electrical main switch on the boiler; 

 

- operation of the system control thermostat; 

 

- operation of the domestic water control thermostat or sensor. 

 
- Ensure gas soundness of the gas intake circuit; insert a “U” or digital type pressure gauge in the pres-
sure 
  test point upstream of the gas valve and then close the boiler shutoff valve.  No pressure variation must  
  occur in the next five minutes on the gauge. 
 
- Ensure activation of the device for protection against the ionisation flame control gas; activation time 
must  
  be less than ten seconds 
 
- Visually inspect to check for leakage of water or oxidation of fittings. 
 
- Check visually that the water safety valve outlets are not blocked and that the tundish is clear. 
 
- Check that the charge of the expansion vessel after discharging system pressure to the zero setting  
  (check via boiler pressure gauge) is at 1,0 bar. 
 
- Check that the system static pressure (in cold conditions and after system recharging via the filling 
valve)  
  is between 1 and 1.2 bar. 
 
- Check visually that the safety and control devices have not been tampered with and/or shorted, in  
  particular: 
- temperature safety thermostat; 
- air pressure switch. 
 
- Ensure correct maintenance and condition of the electrical installation with particular reference to: 
 

-electrical cables must be correctly routed 

 

-no traces of black marking or burns 

 

Summary of Contents for VICTRIX 24kW X

Page 1: ...ority For Technical assistance spare parts or service call RVR Energy Technology Limited Kenmare Co Kerry Tel 064 41344 Fax 064 89520 Doc Ref ALT107 181207 Read these instructions completely before us...

Page 2: ...I S 820 Non Domestic Gas Installations All relevant Building Regulations Local Water Bye Laws IEE Wiring Regulations Health Safety legislation This appliance meets the requirements of IPX4D ie degree...

Page 3: ...Immergas 80 litre T 30 C in accordance with EN 625 1 min 20 2 Specific range D UB Immergas 105 litre T 30 C in accordance with EN 625 1 min 22 0 Specific range D UB Immergas 120 litre T 30 C in accord...

Page 4: ...uctions Dimensions Victrix 24kW X Key V Electrical connection G Gas supply RU Cylinder return optional MU Cylinder flow optional RR System filling SC Condensate drain min internal diameter 13mm R Syst...

Page 5: ...ectrode 21 Safety thermostat 4 Gas valve 13 Air intake pipe 22 Air valve 5 Voltage transformer 14 Negative signal pressure point 23 Boiler circulating pump 6 Fan 15 Positive signal pressure point 24 S...

Page 6: ...heating tank and connected to terminals 36 and 37 If this cable is routed in close proximity to cables carry ing mains voltages then screened cable should be used The resistor connected to terminals...

Page 7: ...with the round protrusions facing downwards in con tact with boiler flange and tighten using the screws supplied with the kit Fit the male end smooth of the adapter 3 in the female end of the concent...

Page 8: ...he fe male end of the flanges 3 4 Fit the male end of the intake terminal 6 up to the stop on the female end of the bend 5 making sure that the relevant internal and external sealing rings are fitted...

Page 9: ...g tables The resistance factor varies depending on whether the component in question conveys fresh inlet air or hot combustion gases All boilers have a maximum resistance factor of 100 The sum of all...

Page 10: ...nces Component Resistance Quantity Total 80mm Intake pipe 0 87 9 7 83 90 air intake bend 1 9 3 5 7 80mm Flue pipe 1 2 6 7 2 90 Flue bend 2 6 2 5 2 25 93 Total Flue Resistance In this case the total re...

Page 11: ...terminal is fitted within 850 mm of a plastic or painted gutter or 450 mm of painted eaves or 300 mm of a plastic car port roof an aluminium shield at least 1 m long should be fitted to the underside...

Page 12: ...iler may be installed in any room or internal space although particular attention is drawn to the re quirements of the current IEE Wiring Regulations Where a room sealed boiler is installed in a room...

Page 13: ...orporated into the boiler is pre charged to 1 0 bar and is suitable for a sealed heating system with a maximum water content of 80 litres 18 gal Above 80 litres consideration should be given to fittin...

Page 14: ...to heat the hot water tank adequately The hot water only position on the boiler is not in use for this configuration Filling the central heating system The system design pressure cold should be set to...

Page 15: ...appliance with wet hands or other parts of the body and never touch when barefoot never pull electrical cables or leave the appliance exposed to atmospheric agents rain sunlight etc the appliance pow...

Page 16: ...cleaning function symbol Malfunction symbol combined with error code Flame present symbol Burner output scale symbol Fault and anomaly signalling The Victrix 24 kW boiler indicates any malfunctions us...

Page 17: ...valve No pressure variation must occur in the next five minutes on the gauge Ensure activation of the device for protection against the ionisation flame control gas activation time must be less than...

Page 18: ...Page 18 Victrix 24kW X Instructions Variable Heat Output Victrix 24kW X...

Page 19: ...Page 19 Victrix 24kW X Instructions Victrix 24kW X Wiring Diagram...

Reviews: