37
Remove the plastic cap from front beam.
Insert spinnaker pole.
Pass the two short wires from the tack bar through the seam pockets
on both sides of the spinnaker chute and attach to pole using the clevis
pins and split rings.
There are four rope hoops and one rope with plastic bobbles provided with the
spinnaker pack.
A
B
C
h)
i)
j)
4.4 - Assembly - Spinnaker System
Summary of Contents for RSCAT 14
Page 1: ...Rigging Manual V2 PLEASE FOLLOW ASSEMBLY GUIDE IN CORRECT ORDER...
Page 9: ...7 4 1 Assembly Guide Hulls PLEASE FOLLOW ASSEMBLY GUIDE IN CORRECT ORDER...
Page 22: ...20 4 2 Assembly Guide Mast PLEASE FOLLOW ASSEMBLY GUIDE IN CORRECT ORDER...
Page 27: ...25 4 3 Assembly Guide Sails PLEASE FOLLOW ASSEMBLY GUIDE IN CORRECT ORDER...
Page 44: ...42 PLEASE FOLLOW ASSEMBLY GUIDE IN CORRECT ORDER 4 5 Assembly Guide Foils...
Page 45: ...43 4 5 Assembly Foils a b Locking gudgeon Push to release...