49
8.4 - Hoisting The Jib
To complete this section, you will require:
•
The jib
• The jib sheets
•
The top furling unit as attached to the jib halliard
Unroll the jib and connect the head of the sail to the top
furling unit using the shackle.
The furling line emerges from under the beam through the cleat
underneath the Port side.
Ensure that the furling unit is fully charged so that all the furling
line is wound round the unit (turn anticlockwise) and
very little left at the cleat.
Attach the end of the jib halyard with the plastic
stopper on it to both rope loops on the jib head
unit using an overhand knot.
a)
b)
c)
Note: Boats build from April 2017 onwards will have a new style of jib shackle.
The RS Quest Upgrade Pack contains the new shackle and everything else
needed to bring older boats up to current spec.
Summary of Contents for RS Quest
Page 1: ...Rigging Manual V4...
Page 11: ...9 Rigging Guide 4 Hull PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 43: ...41 Rigging Guide 7 Boom PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 48: ...46 Rigging Guide 8 Mainsail and Jib PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 58: ...56 Rigging Guide 9 Gennaker Spinnaker PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 65: ...63 Symmetrical Spinnaker Halyard Retrieval Line...
Page 73: ...71 Rigging Guide 11 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 77: ...75 Rigging Guide 12 Outboard bracket PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 80: ...78 Rigging Guide 13 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...