32
Pass one end of the jib halyard through the cleat on the port
side of the mast above the gnav bracket.
Attach the top part of the forestay to the mast.
Attach the lower part of the forestay to the jib furler joint
using the clevis pin and split ring.
Tie off both ends of the jib halyard at the bottom of the mast so that they
are easily accessible once the mast is stepped in the boat.
Add PVC tape around the clevis pin.
6.8 - Spinnaker Halyard Takeup Elastic
Tie the metal ring to one end of the spinnaker halyard takeaway
elastic found in the spinnaker pack using a knot-on-knot.
6.7 - Forestay
c)
a)
b)
a)
6.6 - Jib Halyard
Summary of Contents for RS Quest
Page 1: ...Rigging Manual V4...
Page 11: ...9 Rigging Guide 4 Hull PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 43: ...41 Rigging Guide 7 Boom PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 48: ...46 Rigging Guide 8 Mainsail and Jib PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 58: ...56 Rigging Guide 9 Gennaker Spinnaker PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 65: ...63 Symmetrical Spinnaker Halyard Retrieval Line...
Page 73: ...71 Rigging Guide 11 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 77: ...75 Rigging Guide 12 Outboard bracket PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 80: ...78 Rigging Guide 13 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...