Section 1: Installation & System Description
221822666
1 - 5
Save all shipping hardware that you remove in the following six steps:
Mechanism
CD UNPACKING
1. Remove the CD changer mechanism shipping bolt from the back of the phonograph cabinet
(see Figure 1-3).
Figure 1-3. Shipping Bolt Removal
2. Remove the shipping tape from the front ends of the mechanism tie-down levers on the side of the mechanism
frame
(see Figure 1-4).
3. Push the end of the lever down slightly, rotate the lever away from the frame until the latch tab clears the hole
in the frame, rotate the lever up until the mechanism is free, and remove the levers.
Figure 1-4. CD Changer Tie-Down Screws
Tie-Down Bolt
Mechanism Frame
Summary of Contents for CD-100K LASERSTAR STARGLO
Page 3: ...i i 21822666 Thispageintentionallyleftblank...
Page 10: ......
Page 42: ...Section 2 Installation Programming 21822666 2 17 Thispageintentionallyleftblank...
Page 46: ...Section 2 Installation Programming 21822666 2 21 Thispageintentionallyleftblank...
Page 52: ...Section 2 Installation Programming 21822666 2 27 Thispageintentionallyleftblank...
Page 58: ......
Page 60: ...Section 2 Installation Programming 21822666 2 35 Thispageintentionallyleftblank...
Page 72: ......
Page 92: ......
Page 125: ...CD 100K Phonograph 2 100 21822666 Thispageintentionallyleftblank...
Page 127: ......
Page 129: ......
Page 131: ......
Page 133: ......
Page 135: ......
Page 137: ......
Page 139: ......
Page 141: ......
Page 143: ......
Page 148: ...Section 2 Installation Programming 21822666 2 105 Thispageintentionallyleftblank...