3. INSTALLATION AND CONNECTION
Voltage Supply Box and Weft Feeder installation
1.
Fix the Voltage Supply Box to the Stand by means of the proper brackets.
Note:
Minimum distance from the Box to the floor must be 20 cm. (see fig.1)
2.
Install the Weft Feeders on the Stand by means of the existing clamps.
Note:
The feeders must be positioned on the stand according to the type of installation. It is
important that yarn path is as straight as possible between the Feeders and the loom nozzles.
3.
Place the Feeders' cables and the air tubes inside the tunnel of the Stand.
Electrical connections
1.
Connect the Feeder's cables to the Voltage Supply Box by following the numeric
correspondence to the loom nozzles (Feeder working with the weft threaded in nozzle 1 must
be connected to the position 1 of the Voltage Supply Box; etc.).
2.
Connect the CAN BUS cable to the loom (see fig.2 page 8).
3.
Feeder's Stand and Creel must be connected to the earth of the loom.
4.
Connect the plug of the 3-phase power cord to the socket on the loom main control cabinet
(MCC). See fig.2 page 8.
Warning!
The connection between the Voltage Supply Box and the 3-phase power supply
network must always be as stated on the following page. In this way, the loom main switch
performs also as main switch for the Weft Feeders (see fig. 2 page 8).
Note:
The Voltage values supplied to the Weft Feeders can be checked on the Voltage
Supply Box connectors (see fig. 3 page 8).
Summary of Contents for SUPER ELF X3
Page 9: ...SUPER ELF X3 Dornier 8 ...
Page 21: ...SUPER ELF X3 Dornier 20 6 SPARE PARTS ...
Page 22: ...SUPER ELF X3 Dornier 21 ...
Page 23: ...SUPER ELF X3 Dornier 22 ...
Page 24: ...SUPER ELF X3 Dornier 23 ...