SUPER ELF X3
– Dornier
18
Reserve loading (Full threading, only with funnel)
1.
Press the start push-button
1
on the side of the feeder for more than 3 seconds: the
Electromagnet pin goes up and the Winding Disc automatically moves to the threading
position.
2.
Release a few coils from the package and keep the yarn end near the input threading
eyelet, than press the full threading button
4
to thread the weft through the feeder body out to
the pulsar (if the old reserve is still on the spool body it will be automatically blown out).
3.
Press the key in the front of the feeder a second time: the Electromagnet goes down and
the Feeder loads the reserve.
Weft reserve repair (Half threading)
If during the Feeder operation, a weft breakage occurs at Feeder's entry, proceed as
follows:
1.
Release a few coils from the package and keep the yarn end near the input threading
eyelet, than press the half threading button
3,
so that the weft is blown to the output of the
winding disk without affecting the existing reserve on the Spool Body. This operation allows
the weft to be knotted to the existing reserve.
2.
Press the start push-button
1
on the front of the feeder in order to reset the weft breakage
error. The feeder will restore the complete weft reserve.
Summary of Contents for SUPER ELF X3
Page 9: ...SUPER ELF X3 Dornier 8 ...
Page 21: ...SUPER ELF X3 Dornier 20 6 SPARE PARTS ...
Page 22: ...SUPER ELF X3 Dornier 21 ...
Page 23: ...SUPER ELF X3 Dornier 22 ...
Page 24: ...SUPER ELF X3 Dornier 23 ...