![Rohde & Schwarz ZND Series Getting Started Download Page 20](http://html.mh-extra.com/html/rohde-and-schwarz/znd-series/znd-series_getting-started_1477891020.webp)
Instrument Tour
R&S
®
ZND
20
Getting Started 1316.2407.02 ─ 52
4
Instrument Tour
This chapter gives an overview of the control elements and connectors of the
R&S
ZND and gives all information that is necessary to put the instrument into opera-
tion and connect external devices.
4.1
Front Panel
The front panel of the network analyzer consists of the touchscreen with the diagrams
and softtool panels (left side), the hardkey area (right side) and the test port area
below. Brief explanations on the controls and connectors, the hardkey area and the
rear panel can be found on the next pages.
Figure 4-1: Front View of R&S
ZND
Instrument damage caused by cleaning agents
Cleaning agents contain substances such as solvents (thinners, acetone, etc.), acids,
bases, or other substances. Solvents can damage the front panel labeling, plastic
parts, or screens, for example.
Never use cleaning agents to clean the outside of the instrument. Use a soft, dry, lint-
free dust cloth instead.
Front Panel