R&S AM300
Function Test
Operating manual, 02/2005
3-41
E-1007.9922.12
3.5 Function
Test
Caution
When performing service procedures, follow the requirements of VDE 0701.
Only properly qualified technicians are allowed to repair the R&S AM300. The
instrument does not contain any parts the operator can repair.
Function test
After the R&S AM300 has been switched on ( 3-40), the green LED ON [2]
on the instrument’s front panel comes on. During booting, the "R&S
SmartInstruments" symbol appears on a blue screen background [14].
Booting the R&S AM300 takes approx. 2 minute and is completed when the
waveform and menü bar ( 5-48) appear.
In error case
If the application display ( 5-48) does not appear and the red or the red or
green LED flash alternately, switch the R&S AM300 off and on. In case the
error continues, return the instrument to our service center for checking.
When the red and green LEDs flash alternately [2] an internal error has been
recognized. Return the instrument to our service center for checking.
3.6 EMC
EMC
requirements
The R&S AM300 meets the EMC Directive 89/336/EEC (applied standards
EN 55011 Class B and EN 61326).
To prevent EMI, the R&S AM300 may only be operated with its enclosure
closed. Only appropriately shielded signal and control cables may be used.
External units, such as keyboard, printer or monitor, that are to be connected
to the R&S AM300 must comply with EMC directives.
Summary of Contents for AM 300
Page 2: ...02 2005 ...