This chapter
Chapter 3 describes how to put the R&S AM300 into operation.
Further
information
Chapter 2 contains an overview of the R&S AM300‘s control elements,
indicators, etc.
Chapter 4, “Getting started”, takes you step-by-step through a number of
simple measurements.
Chapter 8 is an in-depth description of the instrument’s interfaces.
Caution
Before putting the R&S AM300 into operation, make the following checks:
Ensure that the ventilation holes are free of obstructions.
Ensure that there are no unsuitable signal voltages connected to the
input.
The R&S AM300’s outputs may not be overloaded and correct polarity
must be ensured.
The instrument may be damaged if the above checks are not performed.
3.1
Unpacking the R&S AM300
Recommended
procedure
When you unpack the R&S AM300, proceed as follows:
1.
Remove the R&S AM300 from its packaging and check that the delivery
is complete using the accessory list ( 1-35).
2.
Carefully check the R&S AM300 for any damage.
3.
If there is damage, immediately contact the carrier who delivered the
instrument. Under these circumstances, it is essential to keep the box in
which the R&S AM300 was transported and the packaging material ( 0-
17).
3.2
Setting up the Instrument
Caution
There is a risk of injury from sharp edges and becoming wedged between the
setting lever and the handle.
Setup instructions
The R&S AM300 must be assembled on a firm, level surface only. The
instrument has a carrying handle which is also used for various setup options.
This handle can be moved into any position, depending on the particular field
of application.